N11 EVK
User Guide
Copyright © Neoway Technology Co., Ltd
6
4 Commissioning
N11 is commissioned through UART. Follow the steps below:
Step 1:
Install USB-to-Serial port driver (PL2303) and ensure that the computer displays the port.
Insert the M5X0-PWR board, and the computer displays
Profile USB-to-Serial Comm Port
under the
Port (COM and LPT1)
node in Device Manager.
Then you can start the commissioning.
Step 2:
Supply power to the module and start it.
Through M5X0-PWR board
Connect the M5X0-PWR board to UART1 of the N11 EVB and your computer.
Push the power supply switch to the UART3.8V side, and put the jumper cap of UART1
Hold the ON/OFF button for 1.2 second. The module is started.