Neles Easyflow RNP Series Скачать руководство пользователя страница 7

7

IMO-218 EN - Issue 8/2020

 Table  4.

Actuator Model Minimum operating time (seconds) for ATEX compliance

RNP 40

0.02

RNP 50

0.02

RNP 63

0.02

RNP 80

0.03

RNP 90

0.03

RNP 100

0.03

RNP 110

0.04

RNP 125

0.04

RNP 150

0.05

RNP 175

0.06

RNP 200

0.06

RNP 250

0.09

RNP 300

0.07

RNP 350

0.09

WARNING:

Valve on which actuator is installed should be earthed properly to 

discharge static charge. 

2.  TRANSPORTATION AND 

STORAGE

Make sure that the actuator and associated equipment have not 

been damaged during transportation. Store the actuator carefully 

before installation, preferably indoors in a dry place. Do not take 

it to the installation site or remove the protective caps of ports for 

piping until just before installation.

Lift the actuator as shown in Fig. 4: in a horizontal position from the 

lifting lugs. Refer to Section 1.4 for weights.

LIFTING ARRANGMENT

RNP 200 / 250

RNP 300 / 350

Figure 4. 

Lifting the actuator

Upon receiving the product check the limit actuator and the 

accompanying devices for any damage that may have occurred 

during transport. 

WARNING: 
DO NOT USE THE DEVICE IF IT IS DAMAGED DURING 

TRANSPORTATION! 

IF THE DEVICE HAS SUFFERED DAMAGE DURING 

TRANSPORTATION DO NOT INSTALL AND USE IT. IN 

CASE OF NOTICING DAMAGE TO THE DEVICE UPON 

RECEIVING IT PLEASE CONTACT THE SUPPLIER.

Store the actuator carefully. Storage indoors in a cool, dry place. 

Temperature limit for the storing is from 4 °C to 40 °C. The actuator 

should be left in its original packing until it is required for the use. 

Do not remove protective plugs until installing the actuator.

3.  MOUNTING AND 

DEMOUNTING

3.1 ACTUATOR GAS SUPPLY

Dry compressed air, nitrogen or natural gas (sweet) can be used 

as supply medium, no oil spraying is needed. The air supply 

connections are presented in the dimensional drawings in Chapter 

9. The maximum supply pressure is depending the selected model.

3.2 INSTALLATION INFORMATION

Before installation please take care of the safety precautions 

mentioned in the Section 1.7.
Ensure that the actuator will not be exposed to pressure in excess 

to the maximum rating as indicated on the actuator nameplate or 

technical documents.
Ensure that throughout the installation that there are no leaks of the 

supply media.
The maximum operating temperature for the actuator depends 

on individual build of actuator. Refer nameplate for operating 

temperature range.
Ensure that the maximum operating temperature as indicated on 

the nameplate is not exceeded during operation, transportation or 

storage of the actuator.

The environment and surrounding should not affect or limit the 

operational safety of the product.
Ensure the product is protected against impact, vibration or any kind 

of movement during operation, transportation and storage.

Product should not be installed in hazardous area that is not 

compatible with the gas group and temperate class indicated on the 

nameplate.
RNP series actuators can be mounted on valve in any desired 

position. However it is recommended to align the centerline of the 

pneumatic cylinder module along the pipeline.
Ensure proper tightening of fasteners and mounting accessories to 

avoid loosening during operation.

All the tubing, fitting and actuation media should be free from 

contamination and filtered to the desired level. Quality of media 

should be as per ISO 8573-1 [5:3:4]. For additional information 

consult Neles.
Ensure proper adjustments of the stopper bolt to desired opening 

and closing of the valve.

Содержание Easyflow RNP Series

Страница 1: ...Easyflow by Neles Series RNP Compact Rack and Pinion Pneumatic Actuators Installation Maintenance and Operating Instructions IMO 218 EN Issue 8 2020...

Страница 2: ...AND DEMOUNTING 7 Actuator gas supply 7 Installation information 7 Mounting the actuator on the valve 8 Operating directions 8 Setting 9 MAINTENANCE 9 Maintenance general 9 Maintenance precautions of...

Страница 3: ...the linear motion of the rack into rotational motion A B A B Double Acting Top View Air supplied to Port A forces pistons apart and toward end positions with exhaust air exiting at Port B a countercl...

Страница 4: ...3 1 3 SR 0 3 0 3 1 5 RNP50 DA 0 15 0 26 0 3 0 3 1 7 SR 0 3 0 3 2 0 RNP63 DA 0 27 0 43 0 3 0 3 2 3 SR 0 3 0 3 2 8 RNP80 DA 0 44 0 69 0 4 0 4 3 1 SR 0 4 0 4 3 9 RNP90 DA 0 72 1 15 0 4 0 4 5 1 SR 0 4 0...

Страница 5: ...4 462 416 514 150 SR 55 226 363 0 137 52 189 104 241 156 293 208 345 260 397 312 449 175 SR 30 168 274 176 283 251 358 326 433 401 508 476 583 551 658 626 733 701 808 175 SR 40 223 366 85 227 160 302...

Страница 6: ...ELEASE IN THE WORST CASE DAMAGE TO THE EQUIPMENT AND PERSONAL INJURY MAY RESULT CAUTION DON T DISMANTLE A PRESSURIZED ACTUATOR DISMANTLING A PRESSURIZED ACTUATOR LEADS TO UNCONTROLLED PRESSURE RELEASE...

Страница 7: ...ir nitrogen or natural gas sweet can be used as supply medium no oil spraying is needed The air supply connections are presented in the dimensional drawings in Chapter 9 The maximum supply pressure is...

Страница 8: ...from jamming due to rust The actuator must not be allowed to come in contact with the pipework because the vibrations may damage it or cause unsatisfactory operation In some cases e g when using larg...

Страница 9: ...110 Quarter turn RNP 125 Quarter turn RNP 150 Quarter turn RNP 175 Quarter turn RNP 200 Quarter turn RNP 250 Quarter turn RNP 300 Quarter turn RNP 350 Quarter turn 4 MAINTENANCE 4 1 MAINTENANCE GENER...

Страница 10: ...TO ENSURE SAFE AND EFFECTIVE OPERATION ALWAYS USE ORIGINAL SPARE PARTS TO MAKE SURE THAT THE ACTUATOR FUNCTIONS AS INTENDED NOTE WHEN SENDING GOODS TO THE MANUFACTURER FOR REPAIR DO NOT DISASSEMBLE T...

Страница 11: ...ded grease for greasing rack and seals Apply the grease with soft brush NOTE Carry out maintenance involving disassembling of actuator in a safe indoor place free from dust water Ensure that air suppl...

Страница 12: ...ators until the pinion becomes free Rotate the pinion 2 in the clockwise direction For Spring return fail safe open actuators until the pinion becomes free d Pull the piston out from each side by hold...

Страница 13: ...s b Fit bottom pinion bearing 15 and bottom pinion seal 11 on to the pinion 2 Apply recommended grease over the pinion bearing surface 15 and on the bottom pinion seal 11 Apply a thin coat all over th...

Страница 14: ...clockwise CCW assembly dot on the pinion is positioned close to the two dots on the top pad of the actuator body then assemble piston For clockwise CW assembly dot on the pinion is positioned close to...

Страница 15: ...For spring return actuators release the air pressure for double acting actuators apply air to Port B This will bring the pistons back to the 0 degree position v Adjust the stroke adjustment screw 5A...

Страница 16: ...s Check bearings Replace bearings when neccessary Moving parts corroded in harsh humid conditions Replace the corroded parts Backlash in joint between actuator and valve Replace parts as necessary 10...

Страница 17: ...PASSIVATION 9 8 COVER BOLT STAINLESS STEEL AISI304 10 1 WASHER PINION POLYACETAL 11 1 O RING PINION BOTTOM NITRILE RUBBER NBR 70SHORE A 12 2 RACK BEARING POLYACETAL 13 2 NUT STOPER BOLT STAINLESS STEE...

Страница 18: ...AINLESS STEEL AISI304 10 1 WASHER PINION POLYACETAL 11 1 O RING PINION BOTTOM NITRILE RUBBER NBR 70SHORE A 12 2 RACK BEARING POLYACETAL 13 2 NUT STOPER BOLT STAINLESS STEEL AISI304 14 1 O RING PINION...

Страница 19: ...G BOTTOM PINION NITRILE RUBBER NBR 70SHORE A 12 2 RACK BEARING POLYACETAL 13 2 NUT STOPER BOLT STAINLESS STEEL AISI304 14 1 O RING TOP PINION NITRILE RUBBER NBR 70SHORE A 15 1 PINION STRIP POLYACETAL...

Страница 20: ...LT STAINLESS STEEL AISI304 14 1 O RING TOP PINION NITRILE RUBBER NBR 70SHORE A 15 1 PINION STRIP POLYACETAL 16 2 COVER SEAL NITRILE RUBBER NBR 70SHORE A 17 1 CIRCLIP PINION SPRING STEEL EN47 GR 3 ZINC...

Страница 21: ...E RUBBER NBR 70SHORE A 12 2 RACK BEARING POLYACETAL 13 2 NUT STOPER BOLT STAINLESS STEEL AISI304 14 1 O RING PINION TOP NITRILE RUBBER NBR 70SHORE A 15 1 PINION STRIP POLYACETAL 16 2 COVER SEAL NITRIL...

Страница 22: ...INION POLYACETAL 11 1 O RING PINION BOTTOM NITRILE RUBBER NBR 70SHORE A 12 2 RACK BEARING POLYACETAL 13 2 NUT STOPER BOLT STAINLESS STEEL AISI304 14 1 O RING PINION TOP NITRILE RUBBER NBR 70SHORE A 15...

Страница 23: ...0SHORE A 12 2 RACK BEARING POLYACETAL 13 2 NUT STOPER BOLT STAINLESS STEEL AISI304 14 1 O RING TOP PINION NITRILE RUBBER NBR 70SHORE A 15 1 PINION STRIP POLYACETAL 16 2 COVER SEAL NITRILE RUBBER NBR 7...

Страница 24: ...ING TOP PINION NITRILE RUBBER NBR 70SHORE A 15 1 PINION STRIP POLYACETAL 16 2 COVER SEAL NITRILE RUBBER NBR 70SHORE A 17 1 CIRCLIP PINION SPRING STEEL EN47 GR 3 ZINC FLAKING 18 1 BEARING BUSH CAM POLY...

Страница 25: ...5 25 25 33 46 45 63 57 57 L 30 34 41 49 58 62 66 73 88 93 132 132 187 187 M 38 42 47 53 57 63 67 76 88 96 157 157 207 207 N A F 12 14 18 18 23 26 28 32 36 41 41 41 41 41 O 14 16 20 20 27 30 33 36 42 4...

Страница 26: ...g spring version SR55 5 5 barg spring version DN00 Double acting 4 Action C Spring to close 90 A Spring to open 90 D Double acting 90 5 Material A Aluminum anodized B Aluminum epoxy paint 6 Pinion pis...

Страница 27: ...27 IMO 218 EN Issue 8 2020...

Страница 28: ...certain other trademarks are either registered trademarks or trademarks of Neles Corporation or its subsidiaries or affiliates in the United States and or in other countries For more information www...

Отзывы: