4.
Preparation
4.1 Read this manual carefully and understand all operating
procedures before using the equipment.
4.2 The equipment must be stored horizontally in a clean,
dry, well ventilated place.
4.3 Please check to ensure all components of machine are
securely fastened. If fastener or connectors are loose they
must be repaired before running the machine.
4.4 Make sure to always check engine oil before operating
machine.
4.4.1 Remove and wipe off dipstick.
4.4.2 Insert dipstick and then remove to check exact level of
the oil.
4.5Engine oil recommendation
4.5.1 Oil is a major factor for overall performance of the
CT4539. Please use 4 stroke oil that exceeds the
standards for API service classification SE.
Содержание CT4539
Страница 2: ......
Страница 5: ......
Страница 10: ......
Страница 14: ......
Страница 39: ...11 Schematic diagram...
Страница 40: ...CANNON TOOLS LTD Add 20 station road Rowley Regis west midlands B65 0JU U K Made in China...