24
Installation
0
7.
Screw in lower screws (hex screws).
0
8.
Stick protective film over the holes of
the 2 lower mounting bolts in the
protective grid.
11.
Remove the protective film from the
two flue ducts.
Take care not to damage the
surfaces which are susceptible to
scratches etc.
12.
Push both sections of the flue panelling
together (slots in the upper section
must be pointing downwards) and
insert into the opening in the extractor
hood.
Protect the cover panels from
scratches, for example by laying the
template used for marking the wall over
the top edge of the lower section.
0
9.
Connect up the air outlet pipe.
10.
Connect the hood to the electricity
supply.
13.
Slide out the upper section and attach
it to the mounting brackets at the sides
with two screws.
14.
Insert the grease filter (refer to
Operating Instructions).
1.
2.
1.
3.
2.
Содержание D96M6 Series
Страница 69: ...D 4 Pa 0 04 mbar 69...
Страница 70: ...70 FD T E 15 A...
Страница 71: ...1 2 8 10 0 10 Off 0 71...
Страница 72: ...72 2 3 1 3 4 A 1 2 3 1 2 1 2 1...
Страница 73: ...73 3 12 Volt 20 Watt G4 4 5 1 2...
Страница 74: ...74 TRGI 50 mm 650 mm 1 550 mm 1...
Страница 75: ...75 D D 4 Pa 0 04 mbar 120 150 120 150 135 685 1040 280 260 550 600 mind 50 mind 60 mind 600 230 40 500 900 600...
Страница 77: ...77 kg 19 2 18 7 60 cm 20 9 20 4 90 cm 1 30 m 3 mm LS...
Страница 78: ...78 1 2 3 550 mm 650 mm 4 4 2 8 mm 6 5 2 2 30 172 461 76 150 mind 550 Elektro mind 650 Gas 600 900 216...
Страница 79: ...09 10 13 2 14 11 12 07 08 2 79 1 2 1 3 2...
Страница 80: ...80 Notizen...
Страница 81: ...81 Notes...
Страница 82: ...82 Notes 060 655...
Страница 83: ...360732 Z 5116X5 1 2 3 4 5 6 2x 10x 2x...