NEX D/DX
9 Appendix A: Installation protocol
Copy the installation protocol, fill it in and save it as a service record.
For values, note the value in the resuJClt column, otherwise, a tick will suffice if the item has been performed or
considered.
WARNING! Risk of personal injury
No zone present during installation, service and cleaning.
If a value is outside the limit or a result is incorrect or missing, this must be rectified before the initial
start-up and normal operation.
Unit No.:
Date:
Performed by:
Control items
Reference
Result
Notes
APPLICATION REQUIREMENTS LIMITS
Installation Area classification (NEX D 22,
NEX DX 21 or 22).
Material MIE (>3 mJ).
DELIVERY CONTROL
Missing components.
Transport damage.
Maintenance access.
MOUNTING
If according to item B: Arm holder re-
volved 180°.
Bolts and nuts suitable for the wall mater-
ial.1200N/1900N/3200N/4500N
Extraction arm is fitted in a horizontal po-
sition.
NEX D/DX housing is properly grounded.
Earth continuity < 100 ohm.
Rotary stop, if applicable.
EN
21
Содержание NEX 2 m
Страница 10: ...NEX D DX 2300 mm 1900 mm A B 2b 2a 6 4 NEX 2 m NEX 3 m 3 NEX 5 m 5 7 10 ...
Страница 12: ...NEX D DX NEX D 1 ground cable NEX DX 2 ground cables 14 12 13 10 15 16 17A 17B 10 ohm Ω 11 12 ...
Страница 13: ...NEX D DX 360 A 12 A B 5 5 or oder ou o of tai eller 13 13 ...
Страница 14: ...NEX D DX or oder ou o of tai eller 14 A 13 mm B 1 3 m m C1 C2 C3 15 14 ...
Страница 15: ...NEX D DX C5 C4 C7 C6 C8 16 15 ...
Страница 67: ...NEX D DX Voci di controllo Riferimento Risultato Note Collegamenti regolati IT 67 ...
Страница 75: ...NEX D DX Controlepunten Referentie Resultaat Opmerkingen Verbindingen afgesteld NL 75 ...
Страница 98: ...www nederman com ...