FX
2
Original/Chem
EN
20
Appendix B: Maintenance checklist
Copy the maintenance checklist, fill it in and save it as a service record.
For values, note the value in the result column, otherwise a tick will suffice if the item has
been performed or considered.
WARNING!
Risk of personal injury.
Always read section
before installation, use, service, or troubleshooting of this
product.
NOTE!
If a value is outside its accepted level, or a result is incorrect or missing, fix the
problem before initial start-up and normal operation.
Unit No.
Date:
Operating hours:
Performed by:
Items to inspect
Interval
Accepted level
OK
Repaired
Replaced Part number
Dismantle the arm. Clean the whole
arm internally and externally.
Annually
Adjust the links.
Annually
Check the mounting of the arm on
wall, bench or ceiling.
Annually
Check the airflow. If it is reduced, the
ventilation system must be inspected.
Annually
Содержание FX2 Original Series
Страница 5: ...FX2 Original Chem 5 ...
Страница 7: ...FX2 Original Chem 7 7 10 1 FX2 Orig FX2 Chem 3 6 8 11 9 2 4 5 7 10 1 3 6 8 11 9 2 4 5 3 4 ...
Страница 8: ...FX2 Original Chem 8 6 7 5 ...
Страница 9: ...FX2 Original Chem 9 9 10 8 ...
Страница 10: ...FX2 Original Chem 10 Max 500 mm 19 69 in Max 1100 mm 43 31 in 11 ...
Страница 12: ...FX2 Original Chem 12 14 A ...
Страница 21: ...FX2 Original Chem 21 EN ...
Страница 29: ...FX2 Original Chem 29 CS ...
Страница 33: ...FX2 Original Chem 33 DE ...
Страница 38: ...FX2 Original Chem DE 38 ...
Страница 42: ...FX2 Original Chem ES 42 ...
Страница 54: ...FX2 Original Chem FI 54 ...
Страница 62: ...FX2 Original Chem FR 62 ...
Страница 70: ...FX2 Original Chem IT 70 ...
Страница 78: ...FX2 Original Chem NL 78 ...
Страница 86: ...FX2 Original Chem PL 86 ...
Страница 94: ...FX2 Original Chem SE 94 ...
Страница 102: ...FX2 Original Chem CN 102 ...
Страница 103: ......
Страница 104: ...www nederman com ...