background image

 

 

2.1.2  Corner Installation:

  

 

Corner to wall clearance – 275 mm 
 

 

 

 

 

2.2 

Floor Protector (Hearth)

 

Unless the heater will be standing on a heat resistant floor 
such as concrete slab with slate or tiles, it will be necessary to 
provide a floor protector (hearth). 

The dimensions given in above (Section 2.1) are the minimum 
required for the floor protector. It must extend no less than 
300 mm in front of the door opening. It may be desirable, for 
example aesthetic reasons, for the floor protector to be 
larger than these minimum dimensions. 

The floor protector shall be constructed of non-combustible 
material no less than 15mm thick and with a thermal 
conductivity not greater than 0.33W/m 

º

K, eg. compressed 

cement sheet. The floor protector may be laid directly on the 
combustible floor. 

For more details and variations on floor protectors refer to 
AS/NZS 2918:2001 Clause 2.2, 3.3.1, & 3.3.2. 

 

 

 

 

 

 

 

 

 

 

If it is necessary to install a heater closer to a combustible 
surface than the stated requirements in Section 2 of this 
Installation Guide, it must be done in accordance with 
Australian Standard AS/NZS 2918:2001 Section 3, Tables 3.1 
& 3.2. 

Shield Construction:- The shield shall be constructed from a 
heat resistant material. The shield must be fixed to the 
surface that requires protection and NOT the heater. 

The Standard allows three options to reduce stated 
clearances. 

 

Single layer of continuous material with Minimum Air Gap of 

12mm—Clearance Factor = 0.40 

Single layer of continuous material with Minimum Air Gap of 

25mm—Clearance Factor = 0.30 

Two spaced layers of continuous material with Minimum Air 

Gaps of 12mm + 12mm—Clearance Factor = 0.20 

The shielding must be open at the top and bottom (vented) 
to allow a continuous air flow. It is this air flow that keeps 
the surface requiring protection cool. Fixings should not 
impede this air flow. 

The shielding needs to go far enough along and up the wall 
so that the original side and rear required clearances are not 
compromised. As the flue is now closer to the wall the 
shielding should also protect the wall from the flue pipe. 

 

For example: 

Side wall clearance for the Big Bakers Oven is 325 mm. 

A 12mm gapped shield on the wall with a factor of 0.40. 

Calculate:- 325 mm x 0.40 = 130 mm. This is the new side 
wall minimum clearance. 

The shielding needs to be large enough so that none of the 
original clearances of 325 mm are compromised. 

 

 

 

 

 

 

 

3. Reducing Clearances to Combustible Walls 

Отзывы: