Necta Snakky 6-30R/I Скачать руководство пользователя страница 21

NECTA SPA TECHNICAL MANUAL 

“ Snakky “ 

Manual  

Snakky

 

 

 

21

 / 23 

11 – HACCP DIRECTIVE 

 

HACCP DIRECTIVE (EEC 93/43 and 96/3) 

Outline and instructions for use 

Notes: What is indicated by the EC Directive

 

 

Directives 

EEC 93/43 and 96/3

 concern the hygiene of food products and are based on the 

HACCP 

(

H

azard 

A

nalysis 

C

ritical 

C

ontrol 

P

oint). 

The purpose of this directive is to safeguard the consumer health, suggesting a series of actions to be taken by the 
vending company, aimed at checking, identifying and correcting any critical aspects in the foodstuff chain, from the 
purchase of products and machines to the dispensing of the product. 

The 

HACCP

 is a system used to analyse any potential risks in the manufacturing and distribution cycle of food 

product and to identify critical points where such risks can occur; the system also highlights the actions to be 

undertaken and the decisions to be made with regard to such critical points, as well as the implementation of 
checking and monitoring procedures.  

 

Therefore, each vending company must develop a 

Company Hygiene Self-control Manual

 according to the 

provisions of the directive - and if necessary use the information and recommendations formulated by some 

associations in the sector. The manual must contain a programming and checking schedule for the hygiene 

condition of each vending machine, and when a new machine is added this must be updated immediately. 

 

Important notes: 
For a correct use of the machine, the directives must be fully applied. The operator is responsible for correct 

operations on a vending machine

 

 

HACCP Directives (EEC 93/43 and 96/3) 

Guidelines for correct application 

 

- Ensure hygiene control with a special manual for correct hygiene practices. 
- After cleaning, do not touch the surface of any elements that may come into contact with food. 

- Wash your hands thoroughly, preferably using disinfectant, before starting any hygiene operations 
- Use disposable sterile gloves 
- Always use a clean cloth to wipe dry. 

- Keep the work area tidy. 
- Check that the product packages are intact and not damaged. 

- Use products within the recommended time period (see expiry date on the package). 
- Always use products from the warehouse according to the principle of “first-in first-out”. 

- Consumables must be kept and transported separate from the cleaning and hygiene products. 
- Drums and sectors must be cleaned regularly (see operating instructions). 
- Do not fill internal zones of the machine with products to be loaded in a second occasion. 

-The products that need to be kept at a refrigerated temperature must be transported to the location of the 

machine in containers that maintain the products at the ideal temperature or in containers that do not allow 

excessive temperature difference. 

CLEANING THE MACHINE 

Carefully observe the following cleaning instructions! Considering that: 

The Snakky normally dispenses products with a long shelf life, but it can be enabled to dispense short shelf life 
products; in this case cleaning must be more frequent and stricter. 
In the following instructions, only the cleaning and hygiene operations for the 

FIRST 

case are described. 

 
Clean the machine, preferably at the end of the day or in the morning before the machine is used, and before 

loading the products to be sold. 

- Fill in the checklist log for cleaning operations. 

- When the display indicates an error message immediately check the trouble-shooting sheet. 
- Use only recommended cleaning products approved for foodstuff, preferably liquid; do not use powder and 

abrasive products that could scratch plastic surfaces. 

Содержание Snakky 6-30R/I

Страница 1: ...A SPA TECHNICAL MANUAL Snakky Manual Snakky 1 23 AFTER SALES SERVICE food snack SERVICE MANUAL SNAKKY BASIC TECHNICAL MANUAL THE CONTENTS OF THIS DOCUMENT ARE INTENDED FOR NECTA S AFTER SALES PERSONNE...

Страница 2: ...11 12 Layout Models Electrical systems connections and configuration Release dispensing storage systems Wiring Power supply Cooling unit Cabinet Door Wiring diagrams Trouble shooting HACCP directive U...

Страница 3: ...ion is not approved by IMQ or that it is awaiting approval DESCRIPTION VARIABLES TRAYS Up to 6 max HEIGHT 0F TRAYS 96 mm min and up to 219 mm max PARTITIONS PER TRAY 2 triple 3 double 6 single PRICES...

Страница 4: ...ations with indication of their position The examples shown below correspond to real layouts indicated on the side in any case there are many configurations options with simple and quick change operat...

Страница 5: ...x 1 5 mm2 section HO5 V V F HO7 RN F Fitted with a fixed SCHUKO plug NOTE For UK there is a specific plug conforming to the standards in force which is adopted for that specific market In the event of...

Страница 6: ...RD CONNECTIONS SP push button card LCD display Board RS232 port Printer PC Programmer Transmitter photodiode card Phototransistor card Receiver NTC Probe Cooling unit control Cooling unit control Lamp...

Страница 7: ...the normal operation YELLOW LED It glows when 5 V DC is present in the board RED LED it glows when the software is reset program malfunction Minidip functions 1 4 19 Coin mechanism setting 2 3 By def...

Страница 8: ...NECTA SPA TECHNICAL MANUAL Snakky Manual Snakky 8 23 TRAY CONNECTION WIRING DIAGRAM CONNECTOR Detail of spiral control ratiomotor To connector J2 SUC board...

Страница 9: ...Receiver photo transistor card IP Sliding panel switch LCD LCD display card M1 6 Spiral control ratiomotors MDB Connector for coin mechanism with MDB protocol MUR Cooler unit MVT Electric fan NTC NTC...

Страница 10: ...itions and the motors one two or three position trays can be used to dispense any products Different pitch spirals are available to be able to load 20 to 76 mm wide products In addition the spirals ca...

Страница 11: ...t function start from the power supply unit FIG 2 All connections for the vending machine control start from the CPU board push buttons payment systems ratiomotors heating elements display FIG 3 The 2...

Страница 12: ...is protected with a main switch and two fuses on both phases It is also fitted with a noise suppressor The CPU boards controls also a relay card for the 230 V 50 Hz actuations Lamps cooling unit and e...

Страница 13: ...o the relay card that activates or deactivates the cooling unit operation The cooling unit is very compact and of the slide in type in any case it is designed to be extracted easily and quickly To acc...

Страница 14: ...future scrapping of the machine the cabinet can be disassembled completely without any complications almost impossible in the case of cabinet injected with foam The base is made with varnished and we...

Страница 15: ...on its front panel the CPU board and the payment system compartment are fitted inside on the central wall The following are fitted on the front panel the main display the coin slot and the coin return...

Страница 16: ...MANUAL Snakky Manual Snakky 16 23 9 WIRING DIAGRAMS POWER SUPPLY AND LIGHTING DIAGRAM 1 2 1 2 power supply to EXE coin mechanisms 3 4 connector J14 24 V DC power supply card 5 6 7 in out connector J3...

Страница 17: ...NECTA SPA TECHNICAL MANUAL Snakky Manual Snakky 17 23 Wiring diagram of tray ratiomotor controls...

Страница 18: ...NECTA SPA TECHNICAL MANUAL Snakky Manual Snakky 18 23 Wiring diagram of CPU board connection See page 6 for connections...

Страница 19: ...ng data which could change the operating default values The machine will continue working but some parameters could have been changed with consequences to the general functioning the RAM needs to be i...

Страница 20: ...orrectly connected Check that the cables are efficient The machine does not start and the display is off The vending machine is protected against short circuits with two line fuses one on each phase w...

Страница 21: ...manual for correct hygiene practices After cleaning do not touch the surface of any elements that may come into contact with food Wash your hands thoroughly preferably using disinfectant before start...

Страница 22: ...the trays and clean the inside of the refrigerated box check for the presence of insects FIG 1 FIG 2 Open the door and disconnect the machine form the power supply FIG 1 Clean the outside and inside o...

Страница 23: ...he cooling unit FIG 3 thoroughly clean the internal base and make hygienic Remove all the dust from the fans and cooling unit condenser FIG 4 Clean and make hygienic the condensation tray FIG 4 Reinst...

Отзывы: