NEC NP2200 Series Скачать руководство пользователя страница 5

ISSUED: 06-16-09  SHEET #: 055-XXXX-1

Visit the Peerless Web Site at www.peerlessmounts.com

5 of 9

For customer care call 1-800-729-0307 or 708-865-8870.

Accessories listed in the included sheet, as well as other parts,
can be ordered through Peerless by calling 1-800-729-0307 or
visiting www.peerlessmounts.com.

Drill two 1/4" (6 mm) dia. holes to a minimum depth of
2.5" (64 mm). Attach projector mount assembly (A)
using two concrete anchors (G), two flat washers (E),
and two #14 x 2.5" wood screws (F) as shown in
Illustration A and 12, and (below). Tighten wood
screws (F) using 3/8" (10 mm) socket wrench until
projector mount assembly (A) is firmly attached.

1

3

Drill hole and insert anchor

Place ceiling plate or mount over anchor and secure
with screw

After repeating step one tighten all fasteners

CUT

A

W

A

Y

 VIEW

INCORRECT

concrete

metal

bracket

plaster/
dry wall

CORRECT

concrete

metal

bracket

plaster/
dry wall

concrete
ceiling

F

F

Installation to Concrete Ceilings

2

A

G

G

Skip to step 6.

G

• Concrete anchors are not intended for attachment to

concrete ceiling covered with a layer of plaster,
drywall, or other finishing material. If mounting to
concrete ceiling covered with plaster/drywall is un-
avoidable, plaster/drywall (up to 5/8" thick) must be
counterbored as shown below. If plaster/drywall is
thicker than 5/8", custom fasteners must be supplied
by installer.

WARNING

• Tighten wood screws firmly, but do not overtighten.

Overtightening can damage the screws, greatly
reducing their holding power.

• Never tighten in excess of 80 in • lb (9 N.M.).

WARNING

• Installer must verify that the wall will safely support

four times the combined weight of all attached equip-
ment and hardware.

WARNING

F

A

CONCRETE CEILING

E

G

ARROW ON TOP OF
PROJECTOR MOUNT
ASSEMBLY INDICATES
FRONT OF MOUNT

3

Содержание NP2200 Series

Страница 1: ...Load Capacity 50 lb 22 7 kg Model NP3250CM Features ImageLockTM alignment prevents picture sag or drift Wrench access slot for easier flush mount installations Exclusive aluminum track quick release N...

Страница 2: ...ss product until you have read and understood the instructions and warnings con tained in this Installation Sheet If you have any questions regarding any of the instructions or warnings call Peerless...

Страница 3: ...ctor mount assembly A by unscrewing captive screw and sliding out connection block as shown CONNECTIONBLOCK CAPTIVESCREW A B C A D G E H F I J K Description Qty Part A projector mount assembly 1 055 2...

Страница 4: ...0 mm socket wrench phillips screwdriver or 10mm open end wrench until projector mount assembly A is firmly attached Installation To Wood Joist Ceilings F F A WOOD JOIST FRONTOF MOUNT E E WOOD JOIST A...

Страница 5: ...ners CUTAWAY VIEW INCORRECT concrete metal bracket plaster dry wall CORRECT concrete metal bracket plaster dry wall concrete ceiling F F Installation to Concrete Ceilings 2 A G G Skip to step 6 G Conc...

Страница 6: ...readed rods not included to the desired height of projector mount assembly Attach projector mount assembly A to the two 1 4 20 threaded rods using two 1 4 20 hex thin nylon insert locknuts as shown in...

Страница 7: ...SCREW CMJ455 SOLD SEPARATELY ARROW INDICATES FRONTOF MOUNT NOTE Refer to accompanying instructions with ceiling plates sold separately for installing these models to ceiling Screw projector mount ass...

Страница 8: ...rated below Align shoulder on connection block opposite notch in adapter plate Attach adapter plate I to connection block from projector mount assembly A using two 10 32 x 3 8 serrated washer head soc...

Страница 9: ...trademarksorregisteredtrademarksoftheirrespectiveowners To adjust yaw swivel for threaded rod mounting applications Loosen locknuts on threaded rods step 5 until projector mount can be rotated Rotate...

Отзывы: