CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
PN-24PRTA (PRT)
NEAX2000 IVS
2
Installation Procedure Manual
Page 368
ND-70928 (E), Issue 3.0
NOTE 2: When the power is on, flip the MB switch to ON (UP position) before plugging/
unplugging the circuit card.
NOTE 3: Set SW0-1 and SW0-2 as follows:
NOTE 4: Mount the PRT card which receives a source clock signal into PIM 0.
NOTE 5: This card must be reset after the SW0-3 to SW0-7 switch settings. Set the MB switch
to UP and then DOWN.
CONDITIONS
PRT0
PRT1
PRT2
• • • • •
PRT7
REMARKS
SW
0-1
SW
0-2
SW
0-1
SW
0-2
SW
0-1
SW
0-2
SW
0-1
SW
0-2
SW
0-1
SW
0-2
When one PRT
is provided.
ON OFF
–
–
–
–
–
–
–
–
MP card will receive the
clock signal from PRT 0
at its PLO 0 input.
When more than
one PRT is
provided.
ON OFF OFF ON OFF OFF OFF OFF OFF OFF
MP card will receive the
clock signal from PRT 0
at its PLO 0 input, under
normal conditions.
Should a clock failure
occur with PRT 0, MP
card will automatically
switch to the PLO 1 input
which gets clock from
PRT 1.
Содержание NEAX2000 IVS2
Страница 1: ...FEBRUARY 2001 NECAmerica Inc ND 70928 E ISSUE 3 STOCK 151998 Installation Procedure Manual...
Страница 19: ...NEAX2000 IVS2 Installation Procedure Manual Page x ND 70928 E Issue 3 0 This page is for your notes...
Страница 73: ...This page is for your notes NEAX2000 IVS2 Installation Procedure Manual Page 44 ND 70928 E Issue 3 0...
Страница 259: ...NEAX2000 IVS2 Installation Procedure Manual Page 230 ND 70928 E Issue 3 0 This page is for your notes...