Page 1: ...Inspur Server i24 NS5162M5 Server Acceptance Manual Version 1 2 Realease date 2020 01 ...

Page 2: ...he contract Inspur Group makes no express or implied statement or warranty on the contents of this document The content of this document may be updated from time to time due to product version upgrades or other reasons Unless otherwise agreed this document is intended as a guide only and all statements information and recommendations in this document do not constitute any express or implied warran...

Page 3: ...ii Inspur proprietary and confidential information Copyright Inspur Electronic Information Industry Co Ltd Version Update Date Version Prepared Revised Reviewer Approver Description 2020 01 10 1 2 ...

Page 4: ...1 4 Hardware Detection 7 1 1 5 Hard Disk Controllers 8 1 1 6 Alarm Firmware Version and Hardware Status Detection 10 2 CMC Test 12 2 1 CMC Test 12 2 1 1 CMC Test 12 3 BMC Test 18 3 1 BMC Test 18 3 1 1 BMC Test 18 4 Hard Disk Controller Test 28 4 1 Hard Disk Controller Test 28 4 1 1 Configuring RAID1 28 4 1 2 Configuring RAID5 29 5 Network Port PXE 31 5 1 1 Network Port PXE 31 6 Customer Acceptance...

Page 5: ...disk backplane is intact Procedure 1 Check whether the packaging is intact and not soaking 2 Check whether the anti shock or anti dumping label turns red if there is a corresponding label The common labels are as follows 3 Check the components in the carton against the packing list Expected result 1 The packaging is in good condition and has no water stain 2 The anti shock or anti fall label is gr...

Page 6: ...r 2 Check whether the mounting ears are in good condition and properly install 3 Check whether the surface label and mylar label are damaged or missing Expected result 1 The chassis is in good condition without scratches oxidation or deformation 2 The mounting ears are in good condition and properly installed 3 The surface label and mylar label of the case are complete and not damaged Description ...

Page 7: ...erver is being powered on 4 No abnormal noise is heard during the power on operation Description None Table 1 4 PSU Hot Swap Function Item Content Objective To verify the PSU hot swap function Prerequisites The structure of the mainboard and hard disk backplane is intact Procedure 1 Insert one PSU into the slot 2 Connect the power cables and wait 10 seconds till the server is powered on 3 Insert s...

Page 8: ...t 10 seconds until the server is powered on 3 Check that the power status indicators on the PSUs are steady on 4 Remove the power cable from the first PSU and remove the first PSU from the slot Check that the other PSU and the server are operating properly 5 Insert the first PSU into the slot Check that the power status indicator is steady on 6 Remove the power cable from the second PSU and remove...

Page 9: ...ses of the network ports 5 View the system serial number S N 6 View the basic input output system BIOS version Expected result 1 The BIOS SETUP screen is displayed 2 The CPU model and quantity are the same as the actual configurations 3 The total memory capacity is consistent with actual configurations 4 Choose Advanced PXE Configuration the MAC addresses of the network ports are displayed 5 The S...

Page 10: ... and the firmware version on the displayed screen 3 On the Adapter Properties screen check the NVDATA version 4 On the SAS Topology menu expand the menu and check the hard disk model and quantity Expected result 1 The SETUP screen is displayed after you press Ctrl C 2 The LSI SAS3008 BIOS versions firmware versions and NVDATA versions are displayed 3 The hard disk model and quantity are the same a...

Page 11: ...figuration interface of the controller 2 The Package FW Version BIOS Version information of the controller can be displayed normally 3 The quantity location and capacity of hard disks are the same as the actual purchase configuration Description None 1 1 6 Alarm Firmware Version and Hardware Status Detection Table 1 9 Alarm Detection Item Content Objective To verify that the indicator has any alar...

Page 12: ...cription None Table 1 10 Hardware Detection Item Content Objective Test BMC basic functions Prerequisites The structure of the mainboard and hard disk backplane is proper and hard disks are detected after the server is powered on Procedure 1 Whether the BMC Network Configuration can be entered normally in the BIOS 2 Details of BMC management function acceptance please see 2 1 BMC management functi...

Page 13: ... 0 10 0 Firefox 9 0 has been installed on the terminal The terminal is connected to the CMC network port on the target server over the network Procedure 1 In the address box enter http xxx xxx xxx xxx xxx xxx xxx xxx is the static CMC ip address that has been set 2 In the Security Alert dialog box click Yes 3 On the login page select 中文 简体 then English and 中文 简体 4 Log in with the user name and the...

Page 14: ...t Description Required for acceptance Table 2 2 Web Interface Power On and Power Off on the WebUI Item Content Objective To verify that you can power on and power off the server on the WebUI Prerequisites AC power is supplied to the server The CMC network port IP address has been set Internet Explorer 8 0 9 0 10 0 Firefox 9 0 has been installed on the terminal The terminal is connected to the CMC ...

Page 15: ...start restart BMC and restore factory settings 2 After you select Power Off make sure it starts to shut down and will not turn on automatically 3 After you select Power On the server is powered on and the OS is started 4 After you select Reset the server OS restarts successfully 5 After performing the restart BMC operation confirm that the BMC has performed the restart operation and the BMC can lo...

Page 16: ...n the displayed page check that the IP address obtaining mode IP address subnet mask default gateway and MAC address of the CMC are displayed 4 Select Automatically obtain IP address and check that all parameters below are unavailable 5 Select Manually set IP address enter an IP address subnet mask and default gateway and click Save Ensure that the new IP address is on the same network segment as ...

Page 17: ... box enter http xxx xxx xxx xxx xxx xxx xxx xxx is the static CMC ip address that has been set 2 Enter the user name root and the default password and click Log In 3 Choose System CMC Firmware Upgrade the Firmware Upgrade page is displayed 4 Select the CMC software upgrade package and click Upgrade Expected result 1 Update CMC on WebUI 2 The CMC versions is correctly displayed The textbox for impo...

Page 18: ...xxx xxx xxx is the static CMC ip address that has been set 2 Enter the user name root and the default password and click Log In 3 Choose Log information CMC System Events and view CMC logs in the right pane Expected result 1 System logs are displayed in descending order based on the time Each record contains the Severity ID Event Source Sensor Description Generated and Status 2 Each page displays ...

Page 19: ...9 0 10 0 Firefox 9 0 has been installed on the terminal The terminal is connected to the BMC network port on the target server over the network Procedure 1 In the address box enter http xxx xxx xxx xxx xxx xxx xxx xxx is the static BMC ip address that has been set 2 In the Security Alert dialog box click Yes 3 On the login page select 中文 简体 then English and 中文 简体 4 Log in with the user name and th...

Page 20: ...ion Required for acceptance Table 3 2 Web Interface Power On and Power Off on the WebUI Item Content Objective To verify that you can power on and power off the server on the WebUI Prerequisites The BMC network port IP address has been set Internet Explorer 8 0 9 0 10 0 Firefox 9 0 has been installed on the terminal The terminal is connected to the BMC network port on the target server over the ne...

Page 21: ...server powers off 3 After you select Power On the server is powered on and the OS is started 4 After you select Reset the server OS restarts successfully 5 The power on and power off operations are logged successfully Description Required for acceptance Table 3 3 Web Interface UID Indicator on the WebUI Item Content Objective Configure positioning indicator for the server on the WebUI Prerequisite...

Page 22: ...ect Blink and the positioning light blinks Description The temporary indicator of the positioning indicator is blinking the frequency is 1Hz and the indicator is blue Required for acceptance Table 3 4 Web Interface Remote KVM on the WebUI Item Content Objective To verify the remote KVM over Java on the WebUI Prerequisites AC power is supplied to the server The BMC network port IP address has been ...

Page 23: ... The BMC network port IP address has been set Internet Explorer 8 0 9 0 10 0 Firefox 9 0 has been installed on the terminal The terminal is connected to the BMC network port on the target server over the network Procedure 1 In the address box enter http xxx xxx xxx xxx xxx xxx xxx xxx is the static BMC ip address that has been set 2 Enter the user name root and the default password and click Log I...

Page 24: ...the new IP address to log in again Table 3 6 Web Interface Firmware Upgrade on the WebUI Item Content Objective To verify that you can upgrade the firmware on the WebUI Prerequisites AC power is supplied to the server The BMC network port IP address has been set Internet Explorer 8 0 9 0 10 0 Firefox 9 0 has been installed on the terminal The terminal is connected to the BMC network port on the ta...

Page 25: ...at you can set the system boot option on the WebUI Prerequisites AC power is supplied to the server The BMC network port IP address has been set Internet Explorer 8 0 9 0 10 0 Firefox 9 0 has been installed on the terminal The terminal is connected to the BMC network port on the target server over the network The DVD ROM drive is connected to the server and the PXE is properly configured Procedure...

Page 26: ...M drive 3 The system boots from the PXE 4 The system boots based on the BIOS settings Description Acceptance options Table 3 8 Web Interface System Logs on the WebUI Item Content Objective To verify system logs on the WebUI Prerequisites AC power is supplied to the server The BMC network port IP address has been set Internet Explorer 8 0 9 0 10 0 Firefox 9 0 has been installed on the terminal The ...

Page 27: ...specific page Description Acceptance options Table 3 9 Web Interface User Management Function on the WebUI Item Content Objective To verify the user management function on the WebUI Prerequisites AC power is supplied to the server The BMC network port IP address has been set Internet Explorer 8 0 9 0 10 0 Firefox 9 0 has been installed on the terminal The terminal is connected to the BMC network p...

Page 28: ...nic Information Industry Co Ltd 4 You can manage BMC users including adding users deleting users and changing passwords Expected result 1 Use the initial admin user to manage BMC users including adding users deleting users and changing passwords Description Acceptance options ...

Page 29: ...edure 1 Power on the server and press Ctrl C at POST The screen for configuring the LSI SAS 3008 controller card is displayed This is in legacy mode UEFI mode needs to be configured in the BIOS see the product user manual for details 2 Select LSI SAS 3008 and press Enter 3 Select RAID Properties and press Enter 4 Select Create RAID1 Volume and press Enter Press to select RAID Disk and press the Sp...

Page 30: ...ess Ctrl R at POST The screen for configuring the LSI SAS 3108 controller card is displayed This is in legacy mode UEFI mode needs to be configured in the BIOS see the product user manual for details 2 Select SAS3108 BIOS Configuration Utility 3 Press F2 and select Create Virtual Drive from the pop up list 4 Press Enter in the RAID Level area box and select the RAID level as RAID 5 by using and 5 ...

Page 31: ...ted the initialization operation is automatically performed when the RAID is created 9 Click OK in the pop up advanced dialog box 10 On the returned Create New VD screen select OK and press Enter The initialization confirmation dialog box appears 11 Click OK in the pop up initialization confirmation dialog box to start the initialization 12 In the returned CU main interface press to expand the fol...

Page 32: ...he server over the network Procedure Power on the server and wait until it starts Press F12 on the first BIOS screen Expected result The server starts over PXE An IP address is obtained for the server The server starts to install an OS over the network Description None Note 1 Before acceptance the system should be properly installed and the software and hardware debugging should pass and the syste...

Page 33: ...n Industry Co Ltd tested when leaving the factory When acceptance is limited the conditions may be random or exempt Statement During the actual acceptance test the acceptance is subject to the contract requirements and the agreement between the two parties This manual is for reference only ...

Page 34: ...n Pass Fail N A Hardware Detection Hardware Detection Pass Fail N A Hard Disk Controllers RAID Controller Card LSI SAS 3008 Pass Fail N A RAID Controller Card LSI SAS 3108 Pass Fail N A Alarm Firmware Version and Hardware Status Detection Alarm Detection Pass Fail N A Hardware Detection Pass Fail N A Remarks Inspur Representative Customer Representative Date ______________________ Date ___________...

Page 35: ...Co Ltd Test Category Test Item Test Sub item Result WebUI IP Address Configuration on the WebUI Pass Fail N A Firmware Upgrade on the WebUI Pass Fail N A System Logs on the WebUI Pass Fail N A Remarks Inspur Representative Customer Representative Date ______________________ Date ______________________ ...

Page 36: ...he WebUI Pass Fail N A UID Indicator on the WebUI Pass Fail N A Remote KVM on the WebUI Pass Fail N A IP Address Configuration on the WebUI Pass Fail N A Firmware Upgrade on the WebUI Pass Fail N A System Logs on the WebUI Pass Fail N A System Logs on the WebUI Pass Fail N A User Management Function on the WebUI Pass Fail N A Remarks Inspur Representative Customer Representative Date _____________...

Page 37: ...ve Customer Representative Date ______________________ Date ______________________ Test Category Test Item Test Sub item Result Network Port Test Network Port PXE Network Port PXE Pass Fail N A Remarks Inspur Representative Customer Representative Date ______________________ Date ______________________ Final Sign off Conclusion Totally 22 items are covered in this acceptance test in which ______ p...