background image

Primergy

PRIMERGY S60
Storage Subsystem   

 

Xenia Fierley
Fujitsu Siemens Computers GmbH cognitas PS
81730 München
e-mail: email:[email protected]
Tel.: (089) 61001-157
Fax: 0 700 / 372 00000
U41221-J-Z156-1-74
Sprachen:  En          

Edition September 2001

Summary of Contents for PRIMERGY S60

Page 1: ... Storage Subsystem Xenia Fierley Fujitsu Siemens Computers GmbH cognitas PS 81730 München e mail email manuals fujitsu siemens com Tel 089 61001 157 Fax 0 700 372 00000 U41221 J Z156 1 74 Sprachen En Edition September 2001 ...

Page 2: ...s your comments are included at the back of the manual There you will also find the addresses of the relevant User Documentation Department Copyright and Trademarks Copyright 2001 Fujitsu Siemens Computers GmbH All rights reserved Delivery subject to availability right of technical modifications reserved All hardware and software names used are trademarks of their respective manufacturers This man...

Page 3: ...German English ...

Page 4: ......

Page 5: ... Environmental Protection 12 3 Operating and Indicator Elements 15 3 1 The Front 15 3 1 1 Meaning of the S60 Operating Status LEDs 16 3 1 2 The Control LEDs for the Hard Disk Drives 18 3 2 The Rear Side 20 3 2 1 FFx RAID Controller Module LEDs 20 3 2 2 Power Supply Unit LEDs 21 3 2 3 Power Switch 22 3 3 Fan LED 23 4 Floorstand Model 25 4 1 Open the Housing 25 4 1 1 Removing and Mounting the door 2...

Page 6: ...e Redundancy 59 9 4 Power connection via UPS 60 10 Installation 61 10 1 Installation Steps 61 10 2 Unpacking the Storage Subsystem 62 10 3 Setting Up the Floorstand Model 62 10 4 Mounting the Rack Model 63 10 4 1 Preparing the Slide Rails 64 10 4 2 Mounting Slide Rails 65 10 4 3 Mounting the Subsystem 65 10 4 4 Routing the Cables 66 10 5 Connecting and Disconnecting Cables 68 10 6 Switching the St...

Page 7: ...74 11 1 4 Storage Subsystem Switches OFF 75 11 1 5 System will not boot after Installation of New HDD Modules 75 11 1 6 HDD READY Indicator does not light up 75 11 1 7 Hard Disk Drives dead on System Start 76 11 1 8 Controller reports Added Hard Disk Drive as defective 76 Abbreviations 77 Related publications 81 Index 83 ...

Page 8: ......

Page 9: ...gement ServerView For the first step the server management for the PRIMERGY S60 storage subsystem will be ensured by SES SCSI Enclosure Service A optional Remote Service Board RSB with more functions can be installed In this case remote diagnosis is available to the customer or service provider for analysis remote system configuration and a remote restart even if the operating system or the hardwa...

Page 10: ...ns which are of importance for commissioning your PRIMERGY S60 storage subsystem in so far as they do not form part of the publication of your server system To understand the different expansion options it is necessary to have a knowledge of hardware and data transmission as well as basic knowledge of the operating system used 1 2 Notation Conventions Italics identifies commands and entries in flo...

Page 11: ...s This chapter gives a detailed description of the operating panel and the connecting elements on the rear panel of the storage subsystem Floorstand model This part of the manual describes how opening and closing the floorstand model housing Power supply This part of the manual describes the power supply units and their power supply Fitting and removing power supply units is also described in deta...

Page 12: ...or during the operation of the storage subsystem 1 4 Technical Data Electrical Characteristics Rated voltage 100 V 240 V Tolerance of the rated voltage 6 10 Rated frequency 50 Hz 60 Hz Rated current max 1 3 A at 240 V max 3 1 A at 100 V Power consumption Active power heat transfer max 305 W Apparent power max 310 VA Power factor PF 0 95 0 99 Dimensions and Weight Floorstand model Rack model Height...

Page 13: ...60950 DIN EN 60950 UL 1950 CSA 950 ZH1 618 Electromagnetic compatibility Emitted interference EN 55022 class B FCC part 15 class A Noise immunity EN 50082 1 CE label Low voltage guideline LVD 73 23 EEC EMC guideline 89 339 EWG Approval certification GS CSA NRTL C CB certificate Noise Development ISO 9296 Operation Idle Sound level LWAd max 7 0 B max 6 2 B Workstation related sound pressure level L...

Page 14: ......

Page 15: ...should only be performed by technicians service personnel or technical specialists Equipment repairs should only be performed by qualified staff Any failure to observe the guidelines in this manual could expose the user to risks electric shock fire hazards and could also damage the equipment Note that any unauthorized opening of the device will result in the invalidation of the warranty and exclus...

Page 16: ...nsmission lines during a storm lightning hazard Systems which comprise a number of cabinets must use a separate fused socket for each cabinet The system unit and the directly connected external storage subsystems should be connected to the same power supply distributor Otherwise you run the risk of losing data if for example the central processing unit is still running but the storage subsystem ha...

Page 17: ...e equipment and tools you use must be free of static charge Ê Remove the power plug before installing or removing modules containing electrostatic sensitive components Ê Only hold modules containing electrostatic sensitive components by their edges Ê Do not touch any of the pins or track conductors on a module containing electrostatic sensitive components Ê Use a grounding strap designed for the p...

Page 18: ...with the limits for a Class A digital device pursuant to part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful inter ferenc...

Page 19: ... up the rack For safety reasons no more than one unit may be withdrawn from the rack at any one time during installation and maintenance work If more than one unit is withdrawn from the rack at any one time there is a danger that the rack will tilt forward The connection of the rack to the mains voltage must be installed by an authorized specialist electrician 2 7 Notes on Transportation I Transpo...

Page 20: ...cled This saves resources and thus reduces the harm done to the environment Notes on saving energy Devices that do not have to be on permanently should not be switched on until they need to be used and should be switched off during long breaks and on completion of work Notes on packaging We recommend that you do not throw away the original packaging in case you need it later for transportation If ...

Page 21: ...in Paderborn Fujitsu Siemens Computers Recycling Center D 33106 Paderborn Tel 49 5251 8180 10 Fax 49 5251 8180 15 Further information on environmental protection The Fujitsu Siemens Computers representative for environmental protection will be happy to answer any further questions you may have concerning environmental protection Fujitsu Siemens Computers Referat Umweltschutz Werner von Siemens Str...

Page 22: ......

Page 23: ...he Front You can see the following indicator elements on the front of the PRIMERGY S60 storage subsystem The three operating status LEDs which indicate the power supply status the cooling status and the server management status Control LEDs for the hard disk drives two LEDs on each of the HDD modules I There is a HDD Ready and a HDD Status LED for each of the 14 possible hard disk drives ...

Page 24: ...f the storage subsystem Figure 2 Operating Status LEDs and Icons on the Front of the Rack Model 1 Power supply status 2 Cooling status 3 Server management status V CAUTION In order to guarantee the server management for the PRIMERGY S60 storage subsystem over SES SCSI Enclosure Service at least one of the two first HDD modules see also section Identification Marks and Loop Addresses on page 43 mus...

Page 25: ...es OFF at an interior temperature of 55 C see section Cooling status LED lights orange on page 73 green Cooling OK All installed fans and the interior temper ature are OK yellow Fan warning One fan has failed The temperature is OK orange Cooling fault All the fans have failed or the interior temperature exceeds the permissible values Server management status global SES indicator none No status ind...

Page 26: ...LEDs of the Hard Disk Drives HDD READY Operating indication of the hard disk drive This LED is driven by the hard disk drive itself HDD STATUS Status indication of the hard disk drive This dual color yellow orange LED is set by the hard disk drive itself yellow indicator or by the SES controller orange indicator H D D R E A D Y H D D S T A T U S ...

Page 27: ...n flashes steadily The associated drive is spinning up or down prepare to remove command ca 10 sec flashes quickly 3 times per sec followed from slowly flashes in 3 sec interval see also section Hot Swap for FC HDD Modules on page 42 HDD STATUS OFF There is no hard disk fault yellow permanently on HDD error occurred orange flashes quickly Drive identification orange flashes quickly Drive rebuild a...

Page 28: ...r switch is placed on this side Figure 4 Rear View of the PRIMERGY S60 Storage Subsystem 1 FFx RAID controller module 1 2 3 Power supply units 4 Power switch 5 FFx RAID controller module 0 default 6 Location for the optional Remote Service Board 3 2 1 FFx RAID Controller Module LEDs The status LEDs are located on the connection panel of the FFx RAID controller module For description see section Th...

Page 29: ...ault indication amber LED 2 Operating indication green LED Fault indication 1 amber LED Operating indication 2 green LED Status of the power supply unit OFF OFF No AC voltage present OFF flashing AC voltage present standby outputs ready OFF ON DC outputs ready Power supply unit operational ON OFF No AC voltage present for this power supply unit or power supply unit has failed flashing ON Current l...

Page 30: ...unction Description I local ON The storage subsystem is switched ON permanently and is connected directly to the mains default setting R The operating mode on off is controlled via the Remote Service Board In this default setting the storage subsystem is switched on and off simultaneously with the server If two servers are connected it remains active as long as one of the servers is switched on O ...

Page 31: ...is a cooling problem the fan status can be read on the fan LED Figure 7 Installed Fan Module View with Fan LED 1 Fan LED I Replacement of the fan module is described in the chapter Fan Module on page 33 Color Meaning Required Measures green Both fans are in operation No action required yellow One fan has failed The fan module must be replaced orange Both fans have failed The fan module must be rep...

Page 32: ......

Page 33: ...oorstand Model 4 1 Open the Housing 4 1 1 Removing and Mounting the door Figure 8 Removing the Door Ê Unlock the door with the key 1 and open it Ê Remove the door by lifting it up 2 Mounting is performed in the reverse order 1 2 ...

Page 34: ...ving the Fan Module on page 34 in the floorstand model the left side cover must be removed Figure 9 Removing the Side Cover Ê Open the door Ê Loosen the lower left knurled screw 1 and slide the left side cover in the direction of the arrow for approx 3cm 2 Ê Remove the side cover from the six guides by sliding it in the direction of the arrow marked 3 1 2 3 ...

Page 35: ... Housing Mounting is performed in the reverse order V CAUTION For mounting the left side cover pay attention to the connection strip 1 for the door switch see figure 10 It can be damaged Figure 10 Floorstand model door switch with connection strip 1 ...

Page 36: ......

Page 37: ...r supply unit fails the subsystem will continue to operate without restrictions I To guarantee a power supply unit redundancy a failed power supply unit must be replaced urgently The power supply units are supplied with mains voltage via the supplied connecting cables The power supply units can be connected directly to two different phases of the in house circuit in order to achieve phase redundan...

Page 38: ...s on page 16 Power Supply Unit LEDs on page 21 and in the chapter Troubleshooting on page 71 Figure 11 Power Supply Unit Removed V CAUTION When a power supply unit is replaced in a non redundant power supply system only one power supply unit present the server must be switched OFF and or the FC channels deactivated Ê If only one power supply unit is present shut down the server and switch it OFF Ê...

Page 39: ...ot adversely affect the installation may be used in the PRIMERGY S60 storage subsystem The coding may not be removed under any circumstances V CAUTION Please ensure that the power supply unit engages correctly in the mounting frame and is locked in position This is the only way to avoid the power supply unit being shaken out of its mountings and damaged during transport Ê Connect the cable to the ...

Page 40: ......

Page 41: ...ntly check the cooling Error messages can be read on the cooling status LED on the front of the storage subsystem see section Meaning of the S60 Operating Status LEDs on page 16 and on the fan LED see section Fan LED on page 23 As soon as fan failure is detected the fan module with the defective fan should immediately be replaced with an intact module so that the redundancy charac teristics availa...

Page 42: ...er on page 26 Rack model Ê Loosen the two knurled screws on the front of the rack model and pull out the storage subsystem from the rack Figure 13 Releasing and Removing the Fan Module Ê Release the fan module by putting two fingers into the recessed grips and push the locking mechanisms found here inwards 1 V CAUTION Note the warning label Rotating Parts 4 on the fan module There is an increased ...

Page 43: ... fan module Figure 14 Installing the Fan Module Ê Put two fingers into the recessed grips 1 When installing it is not necessary to push the locking mechanism inwards Ê Lift the fan module over the slot and insert it carefully 2 Ê Gently push the fan module down until you can feel and hear it engaging 2 1 1 ...

Page 44: ......

Page 45: ...ion or RAID level can be found in the RAID controller documentation A hard disk drive may only be replaced if it is inactive see description of the LEDs in the table Meaning of the HDD Control LEDs Indication on page 19 or if it has been marked as defective in the management tool The hot swap procedure increases the availability of the system operation and guarantees a high degree of data integrit...

Page 46: ...D level 1 or 5 V CAUTION The HDD modules must all be marked clearly see also section Identifi cation Marks and Loop Addresses on page 43 so that they can be put back into the original slots after an upgrade If this is not taken into account existing data can be destroyed The hard disk drives which can be ordered for the PRIMERGY S60 storage subsystem are delivered as HDD modules which include the ...

Page 47: ...e use If the HDD module is removed again and not replaced with a new module then the dummy module must be reinstalled due to cooling the applicable EMC electromagnetic compatibility regulations and fire protection Installing the HDD module Ê Solve the locking mechanism by pressing the locking button 1 Ê Push the handle of the HDD module fully in the direction of the arrow ...

Page 48: ...ush the module handle completely in the direction of the arrow 2 until the locking mechanism 3 engages V CAUTION The HDD module must be acclimatized in its operating environment for an acclimatization time Temperature difference C operating environment outside Minimum acclimatization time hours 5 3 10 5 15 7 20 8 25 9 30 10 Table 6 Acclimatization Time for the HDD Module 1 3 2 ...

Page 49: ...rd Disk Drives Installing Removing HDD Dummy Module Removing occurs in reverse order Figure 17 Removing the HDD Module Ê Pull out the HDD module Observe the notes in the section Handling Hard Disk Drives HDD Modules on page 37 1 ...

Page 50: ...pull out a HDD module which is not defective it must be set to Offline via software RAID controller configuration software and or it must be prepared for removal by the prepare to remove command Ê Pull out the HDD module defective not defective by a few centimeters Ê Wait for at least 60 seconds I This period is necessary for the RAID controller to recognize that a HDD module has been pulled out a...

Page 51: ... disk drives with marks as HDD1 through HDD14 must be performed from the bottom up floorstand model or from left to right rack model The loop addresses of the FC hard disk drives are hardware predefined as follows HDD 1 2 3 4 5 6 7 8 9 10 11 12 13 14 ID Dec 0 1 2 3 4 5 6 7 8 9 10 11 12 13 ID hex 00 01 02 03 04 05 06 07 08 09 0A 0B 0C 0D Table 7 Address IDs ...

Page 52: ......

Page 53: ...Fx RAID controller module 0 see figure 4 on page 20 In a dual active configuration both FFx RAID controller modules must have the same size of cache memory and the same firmware version The module incorporates the FFx RAID controller itself 1 the device adapter DA 2 and the host adapter HA 3 Figure 18 The FFx RAID controller module The FFx RAID controller is a high performance FC host to FC disk a...

Page 54: ...smission medium CU HSSDC MMF or SMF depends on the type of GBIC being used I Perfect functioning will be ensured only by the use of the GBIC types released by Fujitsu Siemens Computers GmbH LEDs indicate the operating status of the module of the corresponding nodes and or loop and the channel activity see tables under Description of the LED indicators on the following pages To configure the FFx RA...

Page 55: ...DAC HOST ACTIVITY 5 LED yellow green 5 DAC NODE STATUS 6 LED yellow green 6 GBIC NODE STATUS 7 LED yellow 7 CACHE 8 LED green 8 DAC STATUS 9 LED red 9 DAC POWER ALARM 10 VT100 DEBUG connector VT100 DEBUG 11 HSSDC connector HSSDC NODE 12 GBIC connector GBIC NODE 1 D A C D E V I C E A C T I V I T Y 2 V T 1 0 0 D E B U G S T A T U S 3 H S S D C N O D E S T A T U S 4 D A C H O S T A C T I V I T Y 5 D ...

Page 56: ...ler module ready and partner failed I This signal is activated only if two FFx RAID controller modules are used only the non defective module can indicate that the other one has failed OFF OFF ON Alarm FFx RAID controller not powered 5 VDC 3 3 VDC OFF OFF flashing 0 5 sec Alarm FFx RAID controller 5 VDC failed OFF OFF flashing 1 sec Alarm FFx RAID controller 3 3 VDC failed ON OFF OFF Cache dirty D...

Page 57: ... Indicators LED Description DAC 5 GBIC 6 HSSDC 3 NODE STATUS yellow green green yellow OFF OFF Module not inserted or not powered ON OFF Full Operation node in the loop active OFF ON Node not in the loop generally Possible causes on GBICs GBIC HW Error status signals active RX_LOS i e the received signal is not valid or TX_FAULT i e sender works not correctly OFF flashing 0 5 sec Node disabled fro...

Page 58: ... OFF flashing 2 sec RS232 switch on position 1 ext and debug mode activated ON OFF RS232 switch on position 2 RSB and debug mode not activated flashing 0 5 sec OFF RS232 switch on position 2 RSB and debug mode activated The switches will be described in the section Switches Table 11 RS232 and FFx Status Indicators Pos Description 1 ext RS232 default The external controlling means will be attached ...

Page 59: ...hes J1 J4 and K1 K4 functionality switches for the setting test and analyzing possibilities in arrangement with the service are available on the host adapter For normal operation the DIP switches J1 J4 K1 K2 and K4 must be set to OFF the DIP switch K3 to ON 1 2 3 4 O N 1 2 3 4 O N R S 2 3 2 s w i t c h 1 2 O N 1 2 3 4 O N 1 2 3 4 D I P s w i t c h K 1 K 4 J 1 J 4 ...

Page 60: ...ftware is active If one FFx RAID controller module is removed the second module automatically takes over its function hot swap V CAUTION As condition for a hot swap action the replaced FFx RAID controller modules FFx RAID controller must have the same firmware version and the same cache memory size DIP switch Function J1 ON Manufactory Diagnosis Mode activated status indicator LEDs red green yello...

Page 61: ...ngs e g both controller must be configured identically In a single mode configuration with only one module installed the storage subsystem must be turned OFF before removing the module Ê Remove all connection cables from the FFx RAID controller module connectors Figure 21 Loosening the Knurled Screw Ê Loosen the knurled screw on the FFx RAID controller module ...

Page 62: ...x RAID controller module may be carried out when upgrading the simplex configuration to a dual active configuration The action cannot be accomplished during normal operation In a dual active configuration the two FFx RAID controller modules must accept each other as partners This requires both modules to have the same FW status and the same cache configuration Ê Check with SAM software whether the...

Page 63: ...is momentary for maintaining cache data content A short power loss cycle may result in loss of FFx RAID controller availability while the controllers re boot The FFx BBU module guaranties that in this time no cache memory data will be lost Depending on the cache memory size and the battery condition the FFx BBU module is capable to maintaining cache memory content for many hours V CAUTION The FFx ...

Page 64: ...hrough cache mode This may slow normal operations Therefore schedule this operation accordingly To ensure that the battery is fully charged and properly conditioned Ê From SAM software select Administration Intelligent BBU Ê Make sure the Charge Level is 100 If the battery is currently charging do not continue until the Charge Level is 100 Ê Select Recondition Battery and Apply Refer to the SAM so...

Page 65: ...to put the PRIMERGY S30 storage subsystem into operation the FC and the mains connections must be attached Figure 23 The Terminals on the Rear Panel 1 FC connection module 1 2 Mains connection 2 3 Mains connection 1 4 FC connection module 0 default 1 2 4 3 ...

Page 66: ...t up the data connection between the system unit and the storage subsystem by connecting the plug on the cable from the system unit with the corresponding FC connector of the storage subsystem I Pay attention that the plug is securely attached to the FC connector Only in this way a smooth data transfer between the system unit and the storage subsystem can be ensured 9 2 Mains Connection The storag...

Page 67: ...provide phase redundancy in the power supply of the subsystem each of the power supply units are directly connected either to two different phases or to two different power circuits of in house mains Figure 25 Mains Connection with Phase Redundancy Ê Connect one end of each power cable marked 1 to one of the power supply units of the storage subsystem Floorstand Model Ê Connect the ends of the pow...

Page 68: ...it is connected directly without UPS to the same phase as the UPS If a power failure occurs the UPS will secure the first power supply unit the second unsecured power supply unit will fail This failure causes the FFx RAID Controller to switch into the degraded mode and the current cache content will be secured duration approx 5 minutes The power supply unit secured over UPS is able to supply the s...

Page 69: ...etail in other sections of this chapter Unpacking the storage subsystem Setting up the floorstand model or mounting the rack model into the rack Cabling the storage subsystem see chapter Connections on page 57 Setting the desired system parameters Connecting the storage subsystem to the mains voltage see section Mains Connection on page 58 or section Mains Connection with Phase Redun dancy on page...

Page 70: ...whether the first page of the guarantee booklet has been completed in full If you find transport damage or inconsistencies between the contents of the package and the delivery note inform your supplier immediately 10 3 Setting Up the Floorstand Model Position the storage subsystem at the intended location Note the following The device must be protected against direct sunlight The required minimum ...

Page 71: ...e subsystem the spring nuts for fixing the slide rails Ê Take the installation instruction in the Technical Manual for the corre sponding rack model for aid Ê Using the mounting aid stencil mark the position of the attachment points of the storage subsystem on the support uprights three height units Refer to the information on the mounting aid Ê Mark the mounting points of the subsystem knurled sc...

Page 72: ...Support brackets to the Slide Rails Ê Position the slide rails 1 on your work surface in the same way as they are to be mounted in the rack with the longer angular edge onto which the storage subsystem will be placed at the bottom and on the inside Ê Position the holding down clamps 2 on the slide rails from the outside so that the drilled holes for your assembly match up on the slide rails and on...

Page 73: ...Lift the storage subsystem onto the two slide rails at the front of the rack and move it back on the rails so that you can work comfortably from behind on the rear of the rack Figure 27 Rear Left Stop Ê Fasten the stop 1 on the left rear edge of the casing box 2 The stop prevents the storage subsystem from being pulled forwards too far since there is resistance on the rear edge of the holding down...

Page 74: ... procedure can be found in the chapter Cable Management in the DataCenter Rack manual Figure 28 Leads Routing Ê Connect the cables to the system unit and to the storage subsystem V CAUTION The cables must have enough over length when connecting to the storage subsystem see figure 28 This is necessary to prevent them being pulled out of the connectors when the subsystem is withdrawn from the rack t...

Page 75: ...he racks or the installation kit for the rack Figure 29 Articulated Cable Guide Proceed as follows Ê Secure the articulated cable guide with the screw to the spring nut placed in the support uprights according to the description in the rack manual The articulated cable guide must be fitted within the height range of the storage subsystem V CAUTION The articulated cable guide should be fixed on the...

Page 76: ...bles to the server and the storage subsystem Mark the cables and make a note of the function of each cable Always note the safety instructions in chapter Important Notes on page 7 Ê Connect the power plugs to appropriately properly grounded power outlets For rack models make sure that the power cables of the devices are connected in such a way that a even distribution of power to the three phases ...

Page 77: ...0 storage subsystem can be switched ON or OFF via its own power switch V CAUTION The storage subsystem must always be switched ON before the connected server V CAUTION The PRIMERGY S60 storage subsystem without Remote Service Board switches OFF at an interior temperature of 55 C see section Cooling status LED lights orange on page 73 ...

Page 78: ......

Page 79: ...e been displayed Ê Switch OFF the connected server and the storage subsystem Ê Contact our Service organization 11 1 Problem Solutions and Tips The following sections describe irregularities which can be observed on the storage subsystem in case of faults Their possible causes are named and there are instructions for troubleshooting 11 1 1 Power Supply Status Indicator Front If the power supply st...

Page 80: ...LED is on the power supply unit is defective or the power supply don t receive power Ê Replace the defective power supply unit see section Replacing the Power Supply Unit on page 30 The problem is cleared if the green LED on the power supply unit is ON and the power supply status indicator on the front of the storage subsystem lights green 11 1 1 3 Power supply status indicator lights orange The d...

Page 81: ...rature in the storage subsystem can exceed the permissible limit values After the fan module has been replaced successfully both the status LED on the fan module and the cooling status LED must light green again 11 1 2 2 Cooling status LED lights orange In this case there is a cooling fault Ê Check whether or not all the fans have failed In this case the status LED on the fan module lights orange ...

Page 82: ...ystem over SES SCSI Enclosure Service at least one of the two first HDD modules HDD1 and HDD2 see also section Identification Marks and Loop Addresses on page 43 must be installed This indication can be activated manually from the ServerView Evaluation is performed with a later version of the storage subsystem 11 1 3 1 Server Management Status LED lights permanently Identification indication can b...

Page 83: ...eve 55 C the storage subsystem switches OFF Ê Wait until the storage subsystem has cooled down 11 1 5 System will not boot after Installation of New HDD Modules I HDD modules should be inserted only while the system is in operation Configuration incorrect FFx RAID controller Ê Call up the configuration menu and check the hard disk drives settings device configuration and the additional settings ad...

Page 84: ...e 11 1 8 Controller reports Added Hard Disk Drive as defective This error message can have the following cause FFx RAID controller not configured for the hard disk drive The HDD module was installed with the system switched OFF Ê Configure the FFx RAID controller retroactively for the drive or Ê Re install the HDD module with the system switched ON If the hard disk drive is still reported as defec...

Page 85: ...péenne European Community DAC Disk Array Controller DC Direct Current DIP Dual In Line Package EEC European Electrotechnical Commission ESD Electrostatic Sensitive Device FC Fiber Channel FCC Federal Communications Commission GAM Global Array Manager GBIC Gigabit Interface Converter HDD Hard Disk Drive ...

Page 86: ...ea Network LED Light Emitting Diode LUN Logical Unit Number MIA Media Interface Adapter MMF Multi Mode Fibre NVRAM Non Volatile Random Access Memory PCI Peripheral Component Interconnect RAID Redundant Arrays of Independent Disks RAM Random Access Memory RFI Radio Frequency Interference RSB Remote Service Board SAM SAN Array Manager ...

Page 87: ...221 J Z156 1 74 79 Abbreviations SCA Single Connector Attachment SCSI Small Computer System Interface SES SCSI Enclosure Service SMF Single Mode Fibre UHD Ultra High Density UPS Uninterrupted Power Supply ...

Page 88: ......

Page 89: ...Channel RAID Controller Quick Installation and Configuration Guide 5 Global Array Manager Client Software with Workstation Array Manager Installation Guide and User Manual 6 Global Array Manager Server Software Installation Guide and User Manual 7 SANArray Manager Client Software Installation Guide and User Manual 8 Embedded Configuration Utility User s Guide 9 PRIMERGY S60 Technical Configuration...

Page 90: ......

Page 91: ...MC guideline 5 emitted interference 5 environmental conditions 5 environmental protection 12 ergonomics 5 F fan LED 23 33 fan module 33 removal 34 replacement 33 FC connection 58 FCC notices 10 FFx RAID controller module adding 54 BBU 56 channel activity 49 connectors 47 device adapter 45 DIP switch 51 FC HUB 46 FFx RAID controller 45 GBIC 47 Host adapter 45 hot swap 47 HSSDC connector 47 indicato...

Page 92: ...tes 10 mounting 26 N noise immunity 5 noise level 5 O operating status LEDs cooling status 16 mains voltage status 16 meaning 17 server management status 16 P packing 12 plastic casing parts adhesive labels 12 power supply status LED lights orange 72 lights yellow 72 remains dark 71 power supply unit coding 31 LEDs 21 redundancy 29 replacement 30 power switch 22 product safety 5 R rack model holdi...

Page 93: ...U41221 J Z156 1 74 85 Index U unpacking storage subsystem 62 V ventilation distance 5 VT100 terminal emulation 46 ...

Page 94: ......

Page 95: ... Subsystem U41221 J Z156 1 74 Comments Suggestions Corrections Submitted by Fujitsu Siemens Computers GmbH User Documentation 81730 München Germany Fax 0 700 372 00000 email manuals fujitsu siemens com http manuals fujitsu siemens com ...

Page 96: ......

Page 97: ... Subsystem U41221 J Z156 1 74 Comments Suggestions Corrections Submitted by Fujitsu Siemens Computers GmbH User Documentation 81730 München Germany Fax 0 700 372 00000 email manuals fujitsu siemens com http manuals fujitsu siemens com ...

Page 98: ......

Page 99: ...tsu com Copyright Fujitsu Technology Solutions 2009 Hinweise zum vorliegenden Dokument Zum 1 April 2009 ist Fujitsu Siemens Computers in den alleinigen Besitz von Fujitsu übergegangen Diese neue Tochtergesellschaft von Fujitsu trägt seit dem den Namen Fujitsu Technology Solutions Das vorliegende Dokument aus dem Dokumentenarchiv bezieht sich auf eine bereits vor längerer Zeit freigegebene oder nic...

Reviews: