Disassembly and Reassembly 4-25
Installing or Swapping a Hard Disk Drive
1.
Open the front door as described earlier in this chapter.
2.
If installing a hard disk drive in a disk carrier for the first time, perform the
following procedures:
Pull the handle out of the disk carrier's front panel and remove the front
panel from the SCSI hard disk drive bay.
Note:
The disk carrier's front panel is no longer needed.
Removing the Disk Carrier's Front Panel
Go to step 5.
3.
If swapping a hard disk drive, remove its carrier from the SCSI hard disk
drive bay and perform the following procedures:
!
CAUTION
Depending on the drive fault, the drive may be still spinning
when you remove it. Follow the next steps exactly when
removing drives.
Pull the disk carrier's handle out.
Pull the faulty disk drive out of the bay far enough to disengage the drive
connector from the backplane. Wait 30 seconds until the drive spins
down.
Remove the carrier from the drive bay.
Содержание NEAX Express
Страница 1: ... S e r v i c e a n d R e f e r e n c e G u i d e NEAX Express ...
Страница 2: ...NEC ...
Страница 3: ... S e r v i c e a n d R e f e r e n c e G u i d e NEAX Express ...
Страница 18: ...xvi Using This Guide NEC ...
Страница 38: ...1 20 System Overview ...
Страница 82: ...3 30 Configuring Your System ...
Страница 136: ...4 54 Disassembly and Reassembly ...
Страница 158: ...5 22 Problem Solving ...
Страница 159: ...6 Illustrated Parts Breakdown Exploded View Field Replaceable Units Redundant Power Cable List ...
Страница 164: ...6 6 Illustrated Parts Breakdown ...
Страница 165: ...A System Cabling System Cabling Before You Begin Static Precautions Standard Configuration ...
Страница 169: ...System Cabling A 5 Standard System Cable Routing A Ultra2 LVD SCSI cable 68 pins B IDE cable 40 pins ...
Страница 170: ...A 6 System Cabling ...
Страница 171: ...B System Setup Utility System Setup Utility SSU Creating SSU Diskettes Running the SSU Exiting the SSU ...
Страница 208: ...C 20 Emergency Management Port ...
Страница 209: ...D Platform Event Paging ...
Страница 224: ...E 14 Connectors ...
Страница 234: ...10 Glossary ...
Страница 241: ...xx ...
Страница 242: ... 456 01510 000 ...