CHAPTER 1
ND-45492 (E)
Page 2
Revision 2.0
3. HOW TO FOLLOW THIS MANUAL
The Installation Procedure is shown by means of flowcharts with NEC Action Procedure (NAP) numbers. The
details of each step are described in the NAPs.
3.1 SCOPE OF INSTALLATION PROCEDURES
This manual covers the installation shown in
Figure 1-2
.
Figure 1-2 Scope of Installation Works
NAP- 200-003
:
INSTALLATION OF MAIN EQUIPMENT
NAP- 200-008
:
MOUNTING OF CIRCUIT CARDS
NAP- 200-004
:
INSTALLATION OF
PERIPHERAL EQUIPMENT
SN610
ATTCON
MDF
MDF CABLE
NAP- 200-006
:
CABLE RUNNING
TO MDF
NAP- 200-007
:
TERMINATION OF
CABLES ON MDF
D
term
TO C.O. LINE, TIE LINE
SINGLE LINE TELEPHONE
TO TAS INDICATOR, ALM
INDICATOR
BATTERY
NAP- 200-005
:
CONNECTION OF BATTERY
SN716
DESKCON