19-INCH RACK-MOUNTING INSTALLATION
(1) When the system is two PIM configuration, connect PIMs with three bolts as shown in Figure 003-1.
(2) Before mounting the PIM, connect the TOP COVER, BOTTOM COVER and AC CORD-A-U to the PIM
as shown in
(3) Secure the 19” BRACKET (H) to the 19-inch Rack as shown in
(4) Mount the PIM on the 19” BRACKET (H) as shown in
.
Then, secure the PIM to the 19” BRACKET (H) as shown in
.
Figure 003-5 Mounting PIM to 19-Inch Rack
A
A
B
PIM
19” BRACKET(H)
C
FRONT
19” BRACKET(H)
19-INCH RACK (IEC)
PIM
BOTTOM COVER
Содержание NEAX 1000 IVS
Страница 14: ...REGULATORY INFORMATION NDA 24219 Page xii Revision 2 0 This page is for your notes ...
Страница 20: ...CHAPTER 2 NDA 24219 Page 6 Revision 2 0 2 2 Installation Methods Figure 2 3 Wall Mounting Installation PIM ...
Страница 21: ...NDA 24219 CHAPTER 2 Page 7 Revision 2 0 Figure 2 4 19 Inch Rack Mounting Installation PIM 19 BRACKET H ...
Страница 22: ...CHAPTER 2 NDA 24219 Page 8 Revision 2 0 Figure 2 5 Desktop Installation PIM ...
Страница 142: ...CHAPTER 3 NDA 24219 Page 128 Revision 2 0 This page is for your notes ...