4-18 Upgrading Your System
10.
Hook the right side of the support panel into the chassis frame and swing the
support panel into position so that the rear edge of the memory boards fits snug
against the panel. The support panel is secured to the chassis by two black fasteners.
Push in on the support panel fasteners until each clicks in the locked position.
11.
Replace the left side panel and turn on the system.
Processors
The following paragraphs provide procedures for installing and removing the Pentium
II Xeon Processor Single Edge Contact (S.E.C.) cartridge. Use these procedures when
upgrading or replacing your processor(s). Each processor is packaged in a S.E.C.
cartridge. The cartridge includes the processor core with an integrated 16 KB primary
(L1) cache, secondary (L2) cache, heat sink, and a back cover. The processors are
supported by one or more voltage regulator modules (VRM) on the CPU baseboard,
depending on the number of installed processors.
Each S.E.C. cartridge installs in a Slot 2 connector on the CPU baseboard. Each slot
must contain either a processor cartridge or a termination board (if there are less than
four processors installed). The VRM modules are installed in a bank of VRM sockets
adjacent to the processors.
Note:
Your system may have up to four processors. All installed
processors must be matched for speed. If replacing a processor, the
replacement processor must match the speed of all installed
processors. If upgrading a processor, all processors must be
upgraded to match.
!
CAUTION
Electrostatic discharge (ESD) can damage components; place them
on an antistatic surface. Update the CPU baseboard using an
antistatic wrist strap attached to chassis ground.
Содержание HX4500
Страница 1: ...U s e r s G u i d e Server HX4500...
Страница 2: ...xxx...
Страница 3: ...U s e r s G u i d e Server HX4500...
Страница 8: ...vi Contents...
Страница 9: ...Contents vii...
Страница 10: ......
Страница 24: ...1 8 System Overview 2 First open the right front door then open the left door see the following figure...
Страница 44: ......
Страница 116: ......
Страница 133: ...A System Cabling Before You Begin Static Precautions RAID Configuration...
Страница 137: ...B Memory Configurations Memory DIMM Configurations...
Страница 140: ......
Страница 154: ......
Страница 157: ...Index 3 U Unpacking 2 3 V Video features 1 17 Video memory installing 4 11...
Страница 158: ...xx...
Страница 159: ......
Страница 160: ...456 00005 000...