3-8
Planning Your System Rack Configuration
Calculating Load and Determining UPS
On-Battery Run Time
When you have chosen your configuration, you can use Table 3-4 and Table 3-5
to determine the load on a single power source and how much run time your
configuration can expect from your UPS in the event your main AC service is
interrupted.
To calculate the load and your on-battery run time, perform the following steps:
1.
Determine the total load placed on each power source. The maximum load
you can place on a single power source is:
Source
Maximum Load
UPS
3000VA (2250W)
PDU
2880VA
Table 3-4 provides Volt/Amp load values of system components and
provides space to include other options.
You can calculate Volt/Amps by multiplying a component’s voltage by its
current requirement.
Voltage * Amps = VA
Or if your component’s power requirement is expressed in watts, multiply its
wattage rating by 1.4.
Watts * 1.4 = VA
Содержание EXPRESS800
Страница 1: ...S e r v i c e G u i d e EXPRESS5800 System Rack...
Страница 2: ...xxx...
Страница 3: ...S e r v i c e G u i d e EXPRESS5800 System Rack...
Страница 11: ...1 Introduction Introduction System Rack Models Configurator Assistant 42U System Rack Multi Bay System Rack...
Страница 16: ......
Страница 28: ......
Страница 32: ...3 4 Planning Your System Rack Configuration Figure 3 1 Mounting Hole Arrangement within a Rack...
Страница 42: ...4 4 Installing the System Rack Figure 4 1 Rack Mounted on Shipping Pallet...
Страница 68: ......
Страница 69: ...6 Illustrated Parts Breakdown Field Replaceable Units Options...
Страница 74: ......
Страница 76: ......
Страница 77: ...xx...
Страница 78: ...456 01544 000...