![NEC Express 456-01721-000 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/nec/express-456-01721-000/express-456-01721-000_read-me-first_4098440011.webp)
-7-
present, see the section
“Stabilizing the Systems”
on page 19
for stabilization guidelines.
When shipped, the system cabinet is tied to the pallet beneath it.
The pallet has a clearance for a pallet jack to move the unit. When
moving a system cabinet, follow these guidelines:
1.
Verify that the unpacked cabinet is still secured to the pallet.
2.
Use a pallet jack to move the cabinet on its pallet to the
installation site.
C A U T I O N
!
Use a pallet jack to move the packaged cabinet,
not a forklift. Using a forklift could damage the
cabinet or a system. Use the pallet jack at the
front or rear of the cabinet.
3.
Position the cabinet pallet so that it has the clearances shown
in
Figure 4
.
Unpacking and Checking the Cabinet
Unless you have a service agreement that includes installation of
the system, you need to unpack the cabinet.
To unpack the cabinet
•
Make sure you have the correct tools.
•
Remove the packing materials.
•
Check the cabinet and system.
•
Verify the system serial numbers.
•
Remove the cabinet from its pallet.
Содержание Express 456-01721-000
Страница 1: ...Read Me First Unpacking Express5800 320Fc System Cabinets NEC Corporation of America 456 01721 000 ...
Страница 4: ... iv ...
Страница 26: ... 22 ...