H.323 Trunk
Document Revision 2
Hardware, Installation and Maintenance Manual
D - 5
___________________________________________________________________________________
___________________________________________________________________________________
7.
Congratulations, you have successfully loaded your application package. Wait
until the following screen is displayed.
8.
You can now remove the IAD(8)-U( ) ETU and configure the Dip Switch Setting
to the applicable Mode of operation (if so required by the package you loaded).
9.
Each application package behaves differently when in functional mode. So,
consult the documentation that is provided with the package prior to using it.
Figure D-4 ETU Successfully Loaded Message
Содержание ELECTRA ELITE IPK II
Страница 2: ......
Страница 3: ...H 323 TRUNK HARDWARE INSTALLATION AND MAINTENANCE MANUAL INT 1074 IPK II DOCUMENT REVISION 1...
Страница 4: ......
Страница 6: ......
Страница 55: ......
Страница 56: ...H 323 TRUNK HARDWARE INSTALLATION AND MAINTENANCE MANUAL NEC Unified Solutions Inc Document Revision 1...