![background image](http://html.mh-extra.com/html/nec/27u/27u_user-manual_250984065.webp)
Installing Rack Components 5-17
Installing Blank Panels
This section describes how to install blank filler panels on the front of your
system rack to give your rack a finished look.
Blank filler panels are available in the following sizes:
!
1U (1.75")
!
2U (3.5")
!
3U (5.25")
!
6U (10.5").
As shown in Figure 5-13, blank panels are attached to the front of the system
rack with cage-nuts, black plastic washers, and the Phillips-head screws, that
you received with the system rack.
Left Front
Right Front
Figure 5-13. Installing a 1U Filler Panel
Содержание 27U
Страница 1: ... U s e r s G u i d e EXPRESS5800 System Rack ...
Страница 2: ...xxx ...
Страница 3: ... U s e r s G u i d e EXPRESS5800 System Rack ...
Страница 11: ...1 Introduction Introduction System Rack Models Configurator Assistant 42U System Rack Multi Bay System Rack ...
Страница 16: ......
Страница 28: ......
Страница 32: ...3 4 Planning Your System Rack Configuration Figure 3 1 Mounting Hole Arrangement within a Rack ...
Страница 42: ...4 4 Installing the System Rack Figure 4 1 Rack Mounted on Shipping Pallet ...
Страница 68: ......
Страница 70: ......
Страница 71: ...xx ...
Страница 72: ... 456 01539 000 ...