2
NCR XL55P Payment Display (1607) Site Preparation
Customer Responsibilities
Before installing the system, the customer must perform or provide the following:
•
When required by NCR, provide the NCR Customer Services representative with
appropriate drawings that indicate:
•
Equipment location
•
Site wiring (power and communications, paths and lengths)
•
Location of other equipment that may generate electrical noise, electromagnetic
interference, or heat
•
Make building alterations necessary to meet wiring and other site requirements
•
Provide and install all communications cables, wall jacks, special connectors, and
associated hardware
•
Provide and install necessary power distribution boxes, conduits, grounds, lightning
protection devices, and associated hardware
•
Ensure all applicable codes, regulations, and laws (including, but not limited to,
electrical, building, safety, and health) are met
•
Provide and install auxiliary power or other equipment as required
•
Provide storage or service areas as required
•
Meet all system/unit environmental requirements
•
Provide and install floor coverings and environment systems that limit or control
static electricity build-up and discharge
In general, keep the NCR equipment area free from dust, smoke, lint, and other
particles. Restrict smoking, eating, and drinking around the equipment. Avoid installing
the equipment near other machines that generate ink, carbon, and paper dust particles.