
2-23
Hardware Installation
d. Route the cables through the neck slot then push cables through the curved
neck opening and then out the base opening. Align the Audio Cable and Display
Port Cable to the left side and the 12V USB Cable to the right side.
e. Pull cables such that most of the cables have been fed through the base opening.
6. Position the display and stand assembly in an upright position.
Содержание XL15
Страница 1: ...User Guide NCR XL15 5915 Release 1 0 BCC5 0000 5162 Issue C...
Страница 19: ...1 10 Product Overview Display Mounts XL Series Stand 5915 F033 5915 K033 Integration Tray Mount 5968 K024...
Страница 20: ...Product Overview 1 11 Checkstand Mount 5968 K039 Wall Mount 7702 K320...
Страница 21: ...1 12 Product Overview Third Party Mounts VESA Adapter 5915 K320...
Страница 22: ...Product Overview 1 13 Customer Display 7702 K453...
Страница 24: ...Product Overview 1 15 Label Locations...
Страница 37: ...Hardware Installation 2 28...
Страница 39: ...Hardware Installation 2 30...