NCR
SelfServ™
84
Walk
‐
Up
ATM
Site
Preparation
2
‐
1
Customer
Responsibilities
NOTICE
This
is
a
contractual
document.
It
contains
important
warnings
and
confers
important
legal
rights
and
obligations.
You
are
advised
to
read
it
carefully.
It
is
the
responsibility
of
you,
the
customer,
to
assure
that
all
installation
preparations
are
complete
and
in
compliance
with
all
specifications
and
requirements
of
NCR
and
all
applicable
national,
state,
or
local
codes,
regulations
and
laws.
This
equipment
must
be
installed
and
used
in
strict
accordance
with
the
manufacturer’s
instructions.
However,
there
is
no
guarantee
that
interference
to
radio
communications
will
not
occur
in
a
particular
commercial
installation.
If
this
equipment
does
cause
interference,
which
can
be
determined
by
turning
the
equipment
off
and
on,
the
user
is
encouraged
to
consult
an
NCR
service
representative
immediately.
CAUTION
NCR
Corporation
is
not
responsible
for
any
radio
or
television
interference
caused
by
unauthorized
modifications
of
this
equipment
or
the
substitution
or
attachment
of
connecting
cables
and
equipment
other
than
those
specified
by
NCR.
Such
unauthorized
modifications,
substitutions,
or
attachments
may
void
the
user’s
authority
to
operate
the
equipment.
The
correction
of
interference
caused
by
such
unauthorized
modifications,
substitutions,
or
attachments
will
be
the
responsibility
of
the
user.
SITE
COMPLIANCE
This
document
contains
the
information
necessary
for
the
preparation
of
a
site
conforming
to
NCR
specifications.
It
is
very
important
that
the
site
complies
with
the
requirements
specified
in
this
document,
because,
once
the
equipment
has
been
installed,
deficiencies
in
site
preparation
or
the
problems
caused
by
these
deficiencies
are
much
more
difficult
to
detect
and
correct.
Further,
failure
to
comply
with
these
requirements
or
to
take
proper
steps
to
protect
equipment
against
risks
identified
in
this
document
may
cause
serious
damage
to
the
equipment
and
to
the
customer’s
business.
In
addition
to
the
need
to
comply
with
the
requirements
specified,
electrical
wiring
and
mechanical
systems
must
also
comply
with
all
relevant
codes,
laws
and
regulations.
It
is
important
that
the
site
be
prepared
by
a
customer
or
his
agent
who
is
fully
conversant
with
the
special
requirements
of
electronic
equipment.
The
responsibility
for
ensuring
that
the
site
is
prepared
in
compliance
with
this
document
remains
with
the
customer.
For
information
and
guidance
purposes
only,
a
list
is
provided,
in
general
terms,
of
those
matters
for
which
the
customer
is
responsible.
This
list
is
not
intended
to
be
comprehensive,
and
in
no
way
modifies,
alters,
or
limits
the
responsibility
of
the
customer
for
all
aspects
of
adequate
site
preparation.
NCR
staff
will
be
available
to
answer
questions
relating
to
the
contents
of
this
document
but,
except
where:
a. the
customer
has
been
notified
that
a
full
or
partial
consultancy
service
is
available
and/or
that
NCR
will
be
willing
to
undertake
a
preliminary
or
final
site
survey
and
b. the
customer
shall
have
entered
into
a
formal
contract
with
NCR
for
provision
of
the
same
no
comment,
suggestion
or
advice
offered
or
not
offered
about
preparation
of
the
site
nor
any
inspection
of
the
site
whether
before
or
after
preparation
is
to
be
taken
as
approval
of
the
location
of
the
site
and
equipment
or
of
its
preparation
and
NCR
will
not
be
liable
in
respect
of
any
comment,
suggestion
or
advice
given
by
its
staff
or
in
respect
of
any
failure
to
give
advice.
Finally,
only
the
customer
can
know
the
full
extent
of
damage
which
may
be
caused
to
his
business
by
reason
of
failure
of
the
equipment
which
is
to
be
installed.
For
this
reason
it
is
the
customer’s
responsibility
to
ascertain
the
extent
of
any
such
possible
damage
to
his
existing
or
planned
business,
and
to
effect,
full
insurance
in
respect
of
it.
CUSTOMER
ACTIONS
The
customer
must
do
or
provide
the
following:
When
required
by
NCR,
provide
the
NCR
customer
service
representative
with
appropriate
drawings
that
indicate:
Location
of
the
equipment
Site
wiring
(power
and
signal,
paths
and
lengths)
Location
of
other
equipment
capable
of
generating
electrical
noise,
electromagnetic
interference,
heat,
etc.
Make
building
alterations
necessary
to
meet
wiring
and
other
site
requirements.
Provide
and
install
all
communications
cables,
wall
jacks,
special
connectors,
and
associated
hardware.
Provide
and
install
necessary
power
distribution
boxes,
conduits,
grounds,
lightning
protection,
and
associated
hardware.
Make
sure
all
applicable
codes,
regulations
and
laws
(including,
but
not
limited
to,
electrical,
building,
safety,
and
health)
are
met.
Provide
and
install
auxiliary
power
or
other
equipment
as
required.
Provide
storage
or
service
areas
as
required.
Make
sure
the
environmental
requirements
of
the
system/unit
are
met.
Provide
floor
coverings
and
environmental
systems
that
limit
or
control
static
electricity
build
‐
up
and
discharge.
Install
the
product
at
a
height
which
meets
the
accessibility
regulations
of
the
relevant
country.