
24
Non-Scale 2-Bag Bagwell Upgrade
5. If not already present, partially thread the two (2) upper screws on the Bagwell side
of the Core. Leave approximately ¼ inch of the threads exposed.
6. Mate the new Bagwell to the Core by lifting the frame up and over the partially
threaded screws.
Note:
Ensure that the two frontmost key holes on the Bagwell are used.
Содержание FastLane SelfServ Checkout 7358
Страница 1: ...Kit Instructions Non Scale 2 Bag Bagwell Upgrade 7358 K122 K145 Issue B...
Страница 3: ...iii Revision Record Issue Date Remarks A Jul 2020 First Issue B Nov 2021 Updated Kit Contents...
Страница 4: ...iv...
Страница 7: ...Non Scale 2 Bag Bagwell Upgrade 3 7358 K122 Non Scale 2 Bag Bagwell Upgrade Walmart Medium Gray...
Страница 10: ...6 Non Scale 2 Bag Bagwell Upgrade 7358 K145 Non Scale 2 Bag Bagwell Upgrade Walmart Light Blue...
Страница 19: ...Non Scale 2 Bag Bagwell Upgrade 15 5 Remove the upper rear screw attaching the Backsplash to the Core...