![NCR 7358-K113 Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/ncr/7358-k113/7358-k113_kit-instructions_3733573034.webp)
3-Bag Bagwell Upgrade
31
Routing Cables for No-Bag unit
These are additional steps in routing cables when upgrading a No-Bag unit to a 3-Bag
unit:
Note:
Use the new USB Power Cable. Route the USB Power Cable to the I/O Box first
before installing new Bagwell.
1. Unlock and open the upper Cabinet Door.
2. Lift the Scale Plate from the Scanner.