Ovation Installation
23
Ovation Installation
New Door Preparation
Drill PPU Flex Cable and Attachment Stud Holes to the new Dis-
penser Door (497-0513464)
Note:
Read all instructions prior to beginning this section.
Warning:
The following steps must be completed prior to beginning the installation
process at the pump dispenser. Power tools like drills cannot be used near the
pump dispensers. Power tools cannot be used in a hazardous location within a
dispenser site. Remove the doors to a safe location prior to drilling or use
pneumatic tools.
1. Drill the PPU Flex Cable hole.
Caution:
use care when drilling to align the holes and center them as indicated.
a. Identify the amount and location of PPUs according to the removed PPU plate
from the old dispenser door.
b. Begin drilling the PPU Flex Cable hole on the indention corresponding to the
correct PPU location using a 3/8 drill bit. Plunge the hole to clean up the edges.
Caution:
Verify the PPU positions prior to drilling.
Содержание 6001-0012-8801
Страница 10: ...x...
Страница 12: ...xii Revision Record Issue Date Remarks A March 2017 First Issue B April 2018 Updating changed Part Numbers...
Страница 16: ...4 Deinstallation 3 Open the dispenser...
Страница 18: ...6 Deinstallation...
Страница 27: ...Deinstallation 15 7 Remove the security switch if present and retain Discard the attaching hardware...
Страница 29: ...Deinstallation 17 b pull out the security bolt and retain...
Страница 71: ...Ovation Installation 59...
Страница 78: ...66 Ovation Installation 3 Attach the grounding cable 497 0513215 to the back cover...