background image

NBE PELLET SYSTEMS  

RTB 

Ready to Burn 

EN303-5 2012 Class 5 

approved by DTI. 

Approved for expansion vessel. 

Energy class AA. 

 

 

 

Manufacturer: 

NBE Production A/S 

Brinken 6-10 Øster Vrå  

Denmark 

www.nbe.dk

 

 

Содержание RTB

Страница 1: ...NBE PELLET SYSTEMS RTB Ready to Burn EN303 5 2012 Class 5 approved by DTI Approved for expansion vessel Energy class AA Manufacturer NBE Production A S Brinken 6 10 ster Vr Denmark www nbe dk...

Страница 2: ...e visible after going to the Extended Setup menu in the controller and enabling the Technical Setup to Yes This will allow you to make changes to the hidden menus for a 30 minute period Save this manu...

Страница 3: ...cation of improper draft of the chimney all operation of your system must cease immediately and must remain so until a solution to the draft problem has been resolved Continuing operation may result i...

Страница 4: ...on Minimum 24W 24W 20W 20W 34W 34W EN303 5 2012 Class 5 5 5 5 5 5 5 5 Controller Version V7 V7 V7 V7 V7 V7 V7 V7 Width mm only boiler 506 506 506 506 623 623 723 723 Depth mm 843 843 843 843 843 843 1...

Страница 5: ...ons 10 kW burner Up to 60kg day 37 watt hour Weight 10kg 16 24kW burner Up to 110kg day 40 watt hour Weight 12kg 30kW burner Up to 150kg day 45 watt hour Weight 15kg 40kW burner Up to 200kg day 60 wat...

Страница 6: ...ible material is covered with non flammable material If the distance is greater than 500 mm the distance requirement is typically satisfied 3 Floor Floors should consist of or be covered with non comb...

Страница 7: ...ty or melted Smoke in the hopper Warm drop shaft Smoke billows out of the fan or boiler during startup If you have any problems with your chimney it is a good idea to keep a diary of any draft problem...

Страница 8: ...t oil for oil burners The floor must be kept free of spilled fuel dust and combustible waste as well as waste from other activities in the room Any burning embers must be extinguished with water and t...

Страница 9: ...degrees Buildings with a roof slope that is less than 20 degrees and is adjacent to another building Buildings with a slope greater than 20 degrees Buildings with a slope greater than 20 degrees and h...

Страница 10: ...oil is small Heat for the house is supplied while hot water is being produced 3 DHW with 3 way valve Typically used when the water heater is large and when the surface coil is large The house is not s...

Страница 11: ...over the boiler must be installed with a cleanout door and must be 500 mm in length above the boiler as to allow for easy dismounting of the controller cassette located at the back of the boiler Inst...

Страница 12: ...t 1300 mm Depth 845 mm Pellet Capacity 220 kg Compatible with RTB sizes 10 16 30 kW 320kg Hopper Width 700 mm Width Boiler Hopper 806 mm Height 1300 mm Depth 845 mm Pellet Capacity 320 kg Compatible w...

Страница 13: ...gure your vacuum transport Big bag Throw the mole in the bag Easy way to transport 1 ton Flat bottom hopper Take advantage of your maximum space Minimizes ceiling height requirements V bottom hopper T...

Страница 14: ...Wiring Diagram...

Страница 15: ...Wiring Diagram...

Страница 16: ...for equipment EKSTRA 3 PE N L9 Boiler Compressor Valve 1 EKSTRA 3 PE N L10 Boiler Compressor Valve 2 BUS GRD TX RX Expansion module ILT V1 V V2 O2 controller KONTAKT K K1 External ON OFF KONTAKT K K2...

Страница 17: ...or INCLUDED WITH RTB Compressor Clean the burner head efficiently with high pressure With low noise compressor Solar heating Use the pellet burner controller to run your solar system External temp sen...

Страница 18: ...roller screen If you do not have the possibility of a direct cable connection these adapters pictured on right can be used They can establish a connection to your router through your household power c...

Страница 19: ...kerkontrol Internet Connection 6 Stokercloud dk will display the location of your system via a drop pin on the stokercloud map If you do not want others to see the exact location of your system simply...

Страница 20: ...E will contact you by e mail and ask your permission to make operational changes If permission is granted to NBE we will monitor your systems operational graphs and burner reaction pattern and make ad...

Страница 21: ...weight II Adjusting the Blower 1 Turn on the system by pressing the ON OFF button on the controller 2 Go to the Regulation menu set Min power 100 Max power 100 This will lock output to 100 power Allo...

Страница 22: ...faces inside the boiler must be brushed clean from any deposits and the ash can must be emptied When empting the ash can pay special attention to any build up of ash in the rear smoke chamber and flue...

Страница 23: ...ice audit of your boiler once a year by an authorized dealer technician in order to prevent unexpected downtime Hours ON OFF RESET DATE 43 External gear 15000 ON NEJ 31 12 12 35 Internal gear 15000 ON...

Страница 24: ...grate is fitted wrong Mount it correctly Too high chimney draft Install a draft stabilizer in the chimney Set electric ignition power up Reduce the fan speed during ignition Stopped fan Check if the f...

Страница 25: ...ate with pipe insulation Too many electric ignitions Flow in the system is fluctuating Set the pressure controlled circulation pump to fixed pressure External thermostat unstable Set External wait up...

Страница 26: ...Hits the smoke boiler surfaces under 47C degrees it starts condensing 7 Open bypass in the boiler applicable only on BS1016 BS2030 BS4050 Release the smoke before the last smoke cooler 15C degrees in...

Страница 27: ...de by agreement with NBE To the extent that NBE is liable to the purchaser NBE s liability is limited only to direct loss and not to damages incurred by connected equipment and or indirect damage loss...

Страница 28: ...CE Declaration of Conformity...

Страница 29: ...d Blower high Comments Date Weighing g kW low kW kW high kW Blower low Blower mid Blower high Comments Date Weighing g kW low kW kW high kW Blower low Blower mid Blower high Comments Date Weighing g k...

Отзывы: