NBE Opop 4120 Скачать руководство пользователя страница 11

Secondary menu on controller.

To gain access to the secondary menu press and hold the SET button  for 

6 seconds.

A1.......The amount of fuel for stoking up at start 

Standard

32 sec.

A2.......Ignition Time

Standard

10 min.

A3.......The effect of the electric ignition

Standard

70 %.

A4.......Value photo sensor shall exceed before there is fire

Standard

10 Lx 

A5.......Total ignitions time

0000 H

A6.......Times the ignitions has ignited

0000 T

A7.......Blower at ignition

Standard

15 % 

B1……Amount of time the burner is allowed to be in pause firing 

Standard

0 min

B2……Fan in pause firing

Standard 

15 %.

B3……Start after pause, degrees below boiler setpoint

Standard 

5 C

B4……Time of blowing when turning to OFF

Standard 

5 min

C1……Oxygen control

Standard 

0 ( OFF )

C2……Calibrating  sensor

 

 

0

C3……Time with low O2 before stopping pellets

Standard 

30 min

D1.......Times of starts each day

Standard 

0 x

D2.......Max running time on each start

Standard 

60 min.

D3.......First start

00.00 H

D4.......Clock, to be adjusted by user

00.00 H

E1…....Cleaning interval

Standard 

10 min.

E2........Cleaning time

Standard 

4 sec

E3…....Cleaning power

Standard 

30 %.

E4…....Minimum power on burner

Standard 

10 %.

E5........Maximum  power on burner

Standard 

100 %.

 

E6........Sommer time, ( low output and more temp. Diff. )

Standard 

0 ( OFF )

E7........Temperature difference over setpoint

Standard 

10 C

 

Off 2

 power of burner    

off 1

 is the watch    

off 3

 internal switch

Other functions on the controller.
Forced feed screw operation

 – to start hold the UP button when switching on. 

To stop press the DOWN button.

Shift between temperature and oxygen displays and smoke temperature 

– 

press DOWN one time (only when connecting the oxygen program).

                                      

Содержание Opop 4120

Страница 1: ...Scotte Opop Installation and operating Manual 16 24 30kw NORDIC BIO ENERGY LTD Pellets Systems...

Страница 2: ...screw and pellet silo assembly page 5 6 Section 4 Installation Boiler connection page 7 Flue pipe connection page 7 Section 5 Operating the burner First time start up page 8 Adjusting the burner page...

Страница 3: ...ing has to be carried out in accordance with Building Regulations Republic of Ireland Part F Ventilation Part J Heat Producing Appliances Article 41 in N Ireland Part J in England and Wales and F in S...

Страница 4: ...tent litres 26 35 56 105 Weight kg 160 200 245 335 Connections 1 1 1 2 Page 3 Burner boiler type Scotte OPOP Output 16 24 30 kW Classification EN 303 5 3 Test pressure 4 0 Bar Max operational pressure...

Страница 5: ...Dimensions of burner and wiring diagram Page 4...

Страница 6: ...hose to the top of the inlet tube on the burner unit and the other end of the thermoplastic hose to the outlet of the feed screw 2 mount the feed screw over the burner so the pellets can fall into th...

Страница 7: ...completely from time to time The more dust that is in the silo the less pellets the feed screw will release and the boiler will become unadjusted leading to inefficiency and possible breakdown How oft...

Страница 8: ...fault Flue pipe and chimney connections Use the correct flue size for boiler model table 1 page 3 Ensure adequate height of chimney to gain satisfactory draw and to prevent back draft A suitable cowl...

Страница 9: ...first time start up refer to quick start guide on page 15 The outputs for high and low loads are run by the control system in a 100 step modulation and the changes between the different steps are mad...

Страница 10: ...d there will also be the risk of a breakdown 3 Feed screw in high load factory settings 33 6 press the UP or DOWN buttons to adjust the quantity of pellets that corresponds to the blower speed It is i...

Страница 11: ...rol Standard 0 OFF C2 Calibrating sensor 0 C3 Time with low O2 before stopping pellets Standard 30 min D1 Times of starts each day Standard 0 x D2 Max running time on each start Standard 60 min D3 Fir...

Страница 12: ...ning The boiler The boiler should be emptied from ash and all of the surfaces should be brushed in order to remove soot particles Pay particular attention to ash in the exhaust deflector and the flue...

Страница 13: ...IS NOT MOUNTED 1 the connector is not mounted correctly 2 dirt in the connector 3 sensor defective Check the connector on the burner Clean pellet debris dust from the connector Change the sensor photo...

Страница 14: ...emperature safeguard with sensors 5 Pump 6 Safeguards set 2 5 bars 7 Pressure expansion 8 Return valve with remote sensors Tap 9 Thermometer 10 Return valve 11 Taps 12 Hot water containers 13 Feed 14...

Страница 15: ...ce Engineers are trained to ensure that your wood pellet burning equipment works safely and efficiently A list of Service Engineers in your area is available from Green Energy Solutions They will chec...

Страница 16: ...Page 14...

Страница 17: ...power the DOWN key stops feed screw 2 Run pellets in a bucket for 15 min Amount 360 sec Pellets 6 min Read the result on the back side Put in the numbers in menu 2 3 4 The feed screw is stopped on do...

Страница 18: ......

Страница 19: ...Quick Start 16kw NBE Pellets Systems Estimating Table...

Страница 20: ...Quick Start NBE Pellets Systems Estimating Table...

Страница 21: ......

Страница 22: ...Quick Start NBE Pellets Systems Estimating Table...

Отзывы: