background image

 83.07 

 83.07 

 164.57 

CB1

JF1

JF1

S1C

Please note 1.5" 

Tec Screws are for 

roof panels only

CHECK 

DIMENSIONS 

TO ENSURE 

CORRECT 

ALIGNMENT

CB1

CB1

CB1

CB1

CB1

JF1

JF1

JF1

S1C

S1

CB1

JF1

JF1

JFT

ST3

ST3

P5

P1

P1

DETAIL B

SCALE 1 : 8

DETAIL C

SCALE 1 : 8

DETAIL D

SCALE 1 : 8

DETAIL E

SCALE 1 : 8

Step 1

 

Assemble 

S1C

 frames to make up the main structure using 

CB1

 brackets

for the corners and 

JF1

 brackets for the straight joints. Attach the 

P1

 posts 

to the 

ST3

 Roof Ties, and fix these to the 

P5

 post using the 

JFT 

Bracket as 

shown below 

5

Содержание SR8306-F

Страница 1: ...Assembly Instructions Shelter type SR8306 F SR8306F 01 22102021 USA...

Страница 2: ...1 14 14 13 13 6 20 4 4 21 10 15 19 9 8 10 9 13 14 15 16 11 12 17 18 15 19 8 2 17 18 11 7 5 5 3 2 EXPLODED VIEW...

Страница 3: ...hallow AR2IS 02 85 2 11 Roof centre lower trim outer AR2CLTO 03 41 4 2 12 Roof centre lower trim inner AR2CLTI 02 40 74 2 13 Roof F Section Outer ARFSO 41 5 4 14 ARFSI Apex Roof F Section Inner ARFSI...

Страница 4: ...4 FIXINGS TOOLS...

Страница 5: ...F1 S1C S1 CB1 JF1 JF1 JFT ST3 ST3 P5 P1 P1 DETAIL B SCALE 1 8 DETAIL C SCALE 1 8 DETAIL D SCALE 1 8 DETAIL E SCALE 1 8 Step 1 Assemble S1C frames to make up the main structure using CB1 brackets for t...

Страница 6: ...2R AR2R AR2R DR Bracket AR2IS AR2IS Step 2 Attach the AR2R Rafters using the DR Brackets Screw the AR2IS End Panels into the top of the frames ensuring they are put in place at the same time as the en...

Страница 7: ...I ARFSI Step 3 Attach the AR2CLTO and ARCLTI trims to the top of the rafters with the AR2CLTO on the edges and the AR2CLTI spaced evenly in the middle Attach the ARFSO and ARFSI to the bottom of the r...

Страница 8: ...S AR2TS AR2TS AR2CUTO AR2CUTO AR2CUTI AR2CUTI Step 4 Align the AR2POA roof panels with the outside of the shelter and space the AR2PIA panels central Attach the AR2TS Strips screwing through the roof...

Страница 9: ...FT1 FT1 FT1 FT1 FT1 FT3 FT3 FT3 FT3 FT3 Step 5 Move the shelter to it s final position and attach the FT1 and FT3 foot brackets Fix the shelter to the ground using the anchor bolts 9...

Страница 10: ...40 75 39 17 87 07 75 87 40 75 81 87 10 PLAN VIEW OVERALL DIMENSIONS AND GROUND FIXING POSITIONS Suggested size for concrete base 8 oversized on all four sides...

Страница 11: ...6443 MAINTENANCE To ensure your products give you many years of use we recommend that you THANK YOU FOR PURCHASING THIS PRODUCT Clean panels regularly with soapy water Ensure all fittings are tight fo...

Отзывы: