NBB SR8301-F Скачать руководство пользователя страница 3

3

PARTS LIST

ITEM 

NO.

PART NAME

DRG 

NUMBER

Size (inch)

IMAGE

QTY.

1

S1C Frame

S1C

78.74 x 40.74

2

2

S3C Frame

S3C

78.74 x 20.3

2

3

JF1 Bracket

JF1

8.7 x 1.6

2

4

CB1 Bracket

CB1

4.3 x 4.3 x 1.6

8

5

ST15 Tie Bar

ST15

20.15 x 1.57 x 1.57

2

6

JFT

JFT

8.66 x 5.9

1

7

ST3 Roof Tie

ST3

81.1 x 1.57 x 1.57

1

8

Post P5

P5

77.15 x 1.57 x 1.57

1

9

DR Bracket

DR

4.3 x 1.6 x 2

8

10

AR1R  1m Pitch Rafter

AR1R

45 x 11.8 OA

3

11

AR1IS  1m Pitch Infill 

Panel Shallow

AR1IS

45.2 x 13.5

2

12

ARFS2  Apex Roof F 

section 2m

ARFS2

83.1 x 2 x 2 

2

13

AR1POA  Roof Panel 

outer alu

AR1POA

41.5 x 24.4

4

14

AR1CLT2  1m Apex 

Roof centre lower trim 

2m

AR1CLT2-02

82.9 x 3.1

1

15

AR1CUT2  1m Apex 

Roof centre upper trim 

2m

AR1CUT2

83.1 x 3.9

1

16

AR1TS  1m Apex Roof 

Trim strips

AR1TS

24.8 x 2.3

2

17

FT1 BRACKET

FT1

1.57 x 1.57 x 3.94

3

18

FT3 Bracket

FT3

1.57 x 3.15 x 4.17

3

19 40x40 Plastic End Cap

EC40

1.6 x 1.6

6

Содержание SR8301-F

Страница 1: ...Assembly Instructions Shelter type SR8301 F SR8301 F 01 07092021 USA...

Страница 2: ...13 13 15 16 11 5 4 11 7 8 2 2 1 1 10 17 17 18 6 3 5 9 12 14 2 EXPLODED VIEW...

Страница 3: ...ket DR 4 3 x 1 6 x 2 8 10 AR1R 1m Pitch Rafter AR1R 45 x 11 8 OA 3 11 AR1IS 1m Pitch Infill Panel Shallow AR1IS 45 2 x 13 5 2 12 ARFS2 Apex Roof F section 2m ARFS2 83 1 x 2 x 2 2 13 AR1POA Roof Panel...

Страница 4: ...ed Drill Screwdriver Mallet 17mm Wrench T25 Torx bit Fittings Bolt set M10 T25 T38 BTANCM12100 M10 x 60mm Nut Washer 1 Tech screw 1 5 Tech screw Black Caps M10 12 x 100mm Concrete Bolt Pack A B 33 33...

Страница 5: ...MENT Please note 1 5 Tec Screws are for roof panels only ENSURE CORRECT ALIGNMENT ON CORNERS CB1 CB1 JF1 S1C S1C S3C S3C JF1 CB1 CB1 JF1 CB1 Step 1 Assemble S1C and S3C frames to make up the main stru...

Страница 6: ...CB1 P5 ST15 ST15 CB1 CB1 CB1 CB1 JFT ST3 6 Step 2 Attach ST15 Tie bars to S3C frames using CB1 Brackets Assemble the ST15 Tie Bars with the ST3 Tie bar and the P5 Post using the CB1 Corner Brackets an...

Страница 7: ...R DR DR DR DR DR AR1IS AR1IS AR1R AR1R AR1R DR DR DR DR DR 7 Step 3 Attach AR1R rafters using DR brackets Secure the AR1IS to S1 frames using tec screws The end rafters need to be placed in position a...

Страница 8: ...ARFS2 ARFS2 AR1CTL2 ARFS2 ARFS2 AR1CTL2 8 Step 4 Attach the AR1CLT2 to the top of the rafters The ARFS2 parts are to be attached to the lower part of the rafters as shown below...

Страница 9: ...T3 FT3 9 Step 5 Attach the AR1POA roof panels to the top of the rafters Cap off the top using AR1CUT2 trim as shown Use the AR1TS strips to cover the gaps between the panels Once the shelter is in the...

Страница 10: ...39 13 42 64 39 17 42 28 45 83 08 PLAN VIEW OVERALL DIMENSIONS AND GROUND FIXING POSITIONS Suggested size for concrete base 7 8 oversized on all 4 sides 10...

Страница 11: ...anels regularly with soapy water Ensure all fittings are tight for example after a big storm Touch up any exposed metal should it get scratched CONTACT DETAILS Email Sales nobutts com Web www nobutts...

Отзывы: