NBB SR8063 Скачать руководство пользователя страница 6

ST5

JF1

CB1

P1

ST5

P1

Step 2

 Use 

JF1

 and 

CB1

 brackets to attach the 

P1

 post and 

ST5

 Tie bar .

6

Содержание SR8063

Страница 1: ...Assembly Instructions Shelter type SR8063 SR8063 01 02112021 USA...

Страница 2: ...20 8 8 8 18 9 11 1 2 5 3 1 4 12 9 7 16 13 21 2 Exploded View...

Страница 3: ...el Shallow AR2IS 85 2 10 AR2TS 2m Apex Roof Trim strip AR2TS 45 5 x 2 3 4 11 FT3 Bracket FT3 4 3 x 3 9 x 3 1 7 12 ST5 Roof Tie ST5 60 75 1 13 CB1 Bracket CB1 4 3 x 4 3 x 1 6 7 14 Roof centre lower tri...

Страница 4: ...4 FIXINGS...

Страница 5: ...ALIGNMENT Please note 1 5 Tech Screws are for roof panels only S1C S3C CB1 JF1 CB1 CB1 CB1 JF1 Ensure correct alignment on all corners JF1 Step 1 Assemble S1C frames to make up the main structure usin...

Страница 6: ...ST5 JF1 CB1 P1 ST5 P1 Step 2 Use JF1 and CB1 brackets to attach the P1 post and ST5 Tie bar 6...

Страница 7: ...AR2R AR2R 40 75 40 75 40 75 FRONT VIEW Step 3 Attach A2R2 rafters unsing DR brackets Secure the End Panels to the frames using 1 Tech Screws The end rafters need to be placed in position at the same...

Страница 8: ...FSO ARFSI ARFSO ARFSO ARFSI AR2CLTO AR2CLTO ARFSO ARFSO ARFSI ARFSI ARFSO ARFSO AR2CLTI Attach the AR2CLTI and AR2CLTO to the top of the rafters The ARFSI and ARFSO parts are to be attached to the low...

Страница 9: ...roof panels AR2POA with the outer edges of the shelter and space the AR2POI panels central Use the AR2TS strips to seal the gap between the roof panels and cap off the top with the AR2CUTO AR2CUTI Onc...

Страница 10: ...123 8 83 10 PLAN VIEW OVERALL DIMENSIONS AND GROUND FIXING POSITIONS Suggested size for concrete base 8 oversized on all 4 sides...

Страница 11: ...anels regularly with soapy water Ensure all fittings are tight for example after a big storm Touch up any exposed metal should it get scratched CONTACT DETAILS Email Sales nobutts com Web www nobutts...

Отзывы: