DR2T
DR2T
FT3
FT1
Step 4
Attach the
FT1
and
FT3
foot brackets to the frames. Make sure the
shelter is square and in its desired position before using the anchor
bolts to fix it to the the ground. Screw down the
DR2T
directly into the
rafters as shown below,
using
1.5" Tech screws.
8