Navien PeakFlowE GXXX001725 Скачать руководство пользователя страница 2

2

Teflon

® 

is a registered trademark of E.I. Dupont de Nemours & Company.

 

Installation Precautions

   Do NOT install system on line pressure above 90 psi.

   Do NOT install system on HOT water line. Failure to limit 

line temperature to 100°F may result in housing failure 
and damage.

   Do NOT install the system backwards with the feed water 

line connected to the outlet.

   Do NOT use liquid pipe compounds for fitting connections. 

USE two to three wraps of Teflon

®

 tape.

   Do NOT solder plumbing connections attached to filter 

housing or inlet valve. Inlet valve and filter housing will be 
damaged by high temperature.

   Do NOT allow system to freeze. Turn off water supply to  

housing and drain housing if temperature falls below 40°F.

   Do NOT install system in direct sunlight or where system is 

exposed to harsh chemicals or may be subjected to being 
struck by moving equipment, carts, mops or any other item 
that may cause damage.

   ALLOW a minimum of 3” under the housing to allow for  

filter replacement.

   IF water hammer is evident, install water hammer arrestors 

before the PeakFlowE

TM

 unit. 

   Do NOT overtighten fitting connections into inlet valve  

or housing outlet. 

   Always back-up valves and fittings with a wrench when   

installing a fitting to avoid turning the valve.

   Do NOT install the unit behind equipment where it may  

be difficult to access the system for filter replacement.

Position the PeakFlowE

TM

 unit in a suitable location. The direction

 

of flow through the PeakFlowE

TM

  unit is always through the inlet 

first; keep this in mind when determining installation location. 
Do NOT mount the PeakFlowE

TM

 system near any source of heat. 

Also, do not mount the system above any device or area that 
would be adversely effected by water. 

WARNING

!

   Do not discard this manual after installation. This manual 

contains important operation, maintenance and precaution -
ary information. Please present this manual to user/operator/
owner after installation.

   It is strongly encouraged that you read this manual before 

installing the system to ensure the best possible installation.

   Installation must conform to all local and state plumbing 

codes and regulations.

   Notice to user/operator/owner: Please retain this manual for 

future reference for parts, maintenance or troubleshooting.

   It is recommended that all personnel responsible for operation 

and maintenance of this product read the precautions,  
operation and maintenance sections of this manual.

NOTICE

Feed Water Chemistry Requirements

pH 

  6.5 to 8.5

Hardness (maximum)

 

  75 grains (1282 ppm CaCO3)

Water Pressure

 

  15 psi to 90 psi (1.03 bar to 6.2 bar)

Temperature 

  40°F to 100°F (5°C to 38°C)

Chlorine 

  < 2 ppm

Iron (maximum)

 

  0.3 mg/l

Manganese (maximum)

    0.05 mg/l

Copper 

  1.3 ppm*

Oil & H2S  

   Must be Removed Prior to PeakFlowE

Polyphosphate

 

   Must be Removed Prior to PeakFlowE

Silica (maximum)

 

  20 ppm** 

**PeakFlowE   + media does not reduce silica scaling. While silica 
tends to have a less significant effect on scale formation than 
other minerals, it can act as a binder that makes water spots 
and scale residue outside the plumbing system difficult to 
remove.

* High levels of copper that originate from new copper plumbing

can foul the PeakFlowE   media. After the installation of a new 
copper plumbing system, wait a minimum of 4 weeks before 
using the PeakFlowE

TM

  system. Avoid applying excess flux on 

the inner surfaces of the pipe and use a low-corrosivity water 
soluble flux listed under the ASTM B813 standard.

WARNING

!

TM

TM

TM

TM

Отзывы: