Navien NFC-250/175H Скачать руководство пользователя страница 3

3

  Venting

 

 

>

 

 

  Electrical Connections/High Altitude DIP Switch Settings

 

>

 

 

Vent Termination Options

Horizontal vent termination

Interior view

Intake Air

Exhaust Gas

12" (300 mm) min.

12" (300 mm) min.

Exterior view

Exhaust Gas

Intake Air

Vertical vent termination

Sidewall vent termination

36” (900 mm) min.

12”

 (300 mm) min.

12” (300 mm)  
min.

Exhaust Gas

12” (300 mm) min
From any 
obstruction 
(above, below, 
left, or right)

Intake Air

12" (300mm) min.*

Concentric Vent Termination

Sidewall installation

Combusion Air Intake

Combusion Air Intake

1" (25mm) min.

Exhaust  

Gas

Maintain 12”  
(300 mm) min. 
clearance above 
highest anticipated 
snow level or grade, 
whichever is greater.

Exhaust Gas

Roof installation

Exhaust Gas

Exhaust Gas

Combusion Air Intake

Maintain 12” (300mm) min. clearance above highest 
anticipated snow level or grade, whichever is greater 
(maximum of 24” above roof ).

Combusion 

Air Intake

Venting Length

3” pipe venting

2” pipe venting

8

1

3

7

2

Maximum Length 150'

Maximum number 
of elbows: 8

2-to-3-inch   

6

1

3

4

5

2

Maximum number 
of elbows: 6

Maximum Length 65'

 

e

90˚ elbow = 5 linear feet of venting

 

e

45˚ elbow= 3 linear feet of venting

 

e

90˚ elbow = 8 linear feet of venting

 

e

45˚ elbow= 4 linear feet of venting

Exhaust Vent Piping Materials

 

e

All Navien boilers are Category IV appliances.

 

e

The venting system should be approved for use with Category IV appliances (typically Type BH 
Special Gas Vent approved by UL 1738-S636).

 

e

Venting requirements in the USA and Canada are different (see below).

Navien recommended venting materials

Locale

Recommended Vent Materials

USA

 

e

PVC/CPVC Schedule 40 or 80 (Solid Core)

 

e

UL1738 approved PVC or CPVC

 

e

Approved Polypropylene (PP)

 

e

Approved Stainless Steel (SS)

Canada*

 

e

Type BH Special Gas Vent Class IIA (PVC)

 

e

Type BH Special Gas Vent Class IIB (CPVC)

 

e

Type BH Special Gas Vent Class IIC (Polypropylene/Stainless Steel)

* For installation in Canada, field-supplied plastic vent piping must comply with CAN/CGA B149.1 (latest 
edition) and be certified to the Standard For Type BH Gas Venting Systems, ULC-S636. Components of this 
listed system must not be interchanged with other vent systems or unlisted pipes or fittings. All plastic 
components and specified primers and glues of the certified vent system must be from a single system 
manufacturer and must not be intermixed with another system manufacturer’s parts. 
The supplied vent connector and vent termination are certified as part of the boiler. 

External LWCO Connection  
(if required by local codes)

Power Connection

1(

&

76B=21(

5

:

&

76B=21(

5

:

&

$&91

$&9/

O/:&2

5

:

&

76B5HFLU

&20

12

1&

=21(B99

&20

12

1&

=21(B99

Neutral

Live

Live

LWCO

Refer to your local codes to determine if an 
LWCO device is required for your system and 
ensure that the built-in device meets the 
requirements. 

120 V AC 60 Hz 
Min. 2 Amp current with proper 
grounding

 

CAUTION

Using abnormally high or low AC 
voltage may cause abnormal operation, 
thereby causing fire which reduces the 
life expectancy of this product.

 

CAUTION

Disconnect the power to 
the boiler before installing 
any wire connections on 
the main PCB. 

Safety

DO NOT touch 
the power 
cord with wet 
hands.

DO NOT allow 
the boiler to be 
exposed to 
excessive 
amounts of 
water.

Confirmation of DIP Switch Settings

DIP Switch 1 (Set of 6 Switches)

SW

Function

Setting

1 & 2

Operation 
Status

Normal 
Operation

1-OFF, 2-OFF

2-stage MAX

1-ON, 2-OFF

1-stage MIN

1-OFF, 2-ON

1-stage MAX

1-ON, 2-ON

5 & 6 Model Setting

NFC-250/200H

5-OFF, 6-OFF

NFC-250/175H

5-ON, 6-OFF

DIP Switch 2 (Set of 8 Switches)

SW

Function

Setting

Comment

1

Gas Type

Natural Gas

1-OFF

Refer to 
Table 1  
on page 
130 in the 
Installation 

Operation 
Manual.

Propane Gas

1-ON

2 & 3

High 
Altitude

0-1,999 ft 
(0-609 m)

2-OFF, 
3-OFF

2,000-5,399 ft 
(610-1,645 m)

2-ON, 
3-OFF

5,400-7,699 ft 
(1,646-2,346 m)

2-OFF, 
3-ON

7,700-10,100 ft 
(2,347-3,078 m)

2-ON, 
3-ON

SW

Function

Setting

Comment

4

Well Pump

Used

4-ON -

Unused

4-OFF -

5 & 6

Country

US/Canada

5-OFF, 
6-OFF

-

7

Space 
Heating 
Thermostat

Used

7-OFF -

Unused

7-ON -

8

Exhaust 
Temperature 
Control

Used

8-OFF -

Unused

8-ON -

Note

 

e

When PCB DIP switch 2 #8 is set to 
On, ensure that CPVC, 
polypropylene, or stainless steel is 
used for exhaust venting.

 

e

This unit may be installed at 
elevations up to 10,100 ft (3,078 m) 
for use with natural gas and 
propane. To use the unit at a specific 
altitude, the DIP switches should be 
set as described above. 

 

e

High Altitude: Above 2,000 ft (610 m), 
the unit will de-rate by 3% for each 
1,000 ft (305 m) of altitude gain.

 

e

For NG, if you install the unit at 
above 5,400 ft (1,646 m), it is 
required to change the Gas Orifice 
for high altitude. Be careful not to 
confuse it with the LP Gas Orifice. 
For detail, refer to page 129 in the 
Installation & Operation Manual.

 

e

Common vent installations for use 
with natural gas and propane are 
only approved for up to 4,500 ft.

Отзывы: