background image

3

  Venting

  

>

  

  Electrical Connections/High Altitude DIP Switch Settings

 >

  

Vent Termination Options

Horizontal vent termination

12" (300 mm) min.

12" (3

00 mm

) min.

Interior view

Intake Air

Exhaust Gas

12" (300 mm) min.

12" (3

00 mm

) min.

Exterior view

Vertical vent termination

Sidewall vent termination

Maintain 12” (300mm) 

from any obstruction 

above, below, left, or right

12" (300 mm) min.

12" (300 mm) min.

36" (900 mm) min.

12" (300mm) min.*

Concentric Vent Termination

Sidewall installation

Combustion Air

Combustion Air

1" (25mm) min.

Maintain 12" (300 

mm) min. clearance 

above highest 

anticipated snow 

level or grade, 

whichever is greater

Vent

Roof installation

Vent

Vent

Combustion Air

Maintain 12” (300mm) min. 

clearance above highest 

anticipated snow level or 

grade, whichever is greater 

(maximum of 24” above roof)

Combustion  

Air

Venting Length

3” pipe venting

2” pipe venting

8

1

3

7

2

Maximum Length 150'

Maximum number 

of elbows: 8

2-to-3-inch   

6

1

3

4

5

2

Maximum number 

of elbows: 6

Maximum Length 60'

 

·

90˚ elbow = 5 linear feet of venting

 

·

45˚ elbow= 3 linear feet of venting

 

·

90˚ elbow = 8 linear feet of venting

 

·

45˚ elbow= 4 linear feet of venting

Exhaust Vent Piping Materials

 

·

All Navien boilers are Category IV appliances.

 

·

The venting system should be approved for use with Category IV appliances (typically Type BH 

Special Gas Vent approved by UL 1738-S636).

 

·

Venting requirements in the USA and Canada are different (see below).

Navien recommended venting materials

Locale

Recommended Vent Materials

USA

 

·

PVC/CPVC Schedule 40 or 80 (Solid Core)

 

·

Approved Polypropylene (PP)

 

·

Approved Stainless Steel (SS)

Canada*

 

·

Type BH Special Gas Vent Class IIA (PVC)

 

·

Type BH Special Gas Vent Class IIB (CPVC)

 

·

Type BH Special Gas Vent Class IIC (Polypropylene/Stainless Steel)

* For installation in Canada, field-supplied plastic vent piping must comply with CAN/CGA B149.1 (latest 

edition) and be certified to the Standard For Type BH Gas Venting Systems, ULC-S636. Components of this 

listed system must not be interchanged with other vent systems or unlisted pipes or fittings. All plastic 

components and specified primers and glues of the certified vent system must be from a single system 

manufacturer and must not be intermixed with another system manufacturer’s parts. 

The supplied vent connector and vent termination are certified as part of the boiler. 

External LWCO Connection  

(if required by local codes)

Power Connection

AC24VN

AC24VL

lLWCO

R

W

C

T/S_Recir.

R

W

C

W

C

T/S_CH_ZONE1

T/S_ZONE2

Neutral

Live

Live

LWCO

Refer to your local codes to determine if an 

LWCO device is required for your system and 

ensure that the built-in device meets the 

requirements. 

120 V AC 60 Hz 

Min. 2 Amp current with proper 

grounding

 CAUTION

Using abnormally high or low AC 

voltage may cause abnormal operation, 

thereby causing fire which reduces the 

life expectancy of this product.

 CAUTION

Disconnect the power to 

the boiler before installing 

any wire connections on 

the main PCB. 

Safety

DO NOT touch 

the power 

cord with wet 

hands.

DO NOT allow 

the boiler to be 

exposed to 

excessive 

amounts of 

water.

Confirmation of DIP Switch Settings

DIP Switch 1 (6 switch unit)

SW

Function

Setting

1 & 2 Operation 

Status

Normal 

Operation

1-OFF, 2-OFF

2-stage MAX

1-ON, 2-OFF

1-stage MIN

1-OFF, 2-ON

1-stage MAX

1-ON, 2-ON

DIP Switch 2 (8 switch unit)

SW

Function

Setting

Comment

1

Gas Type

Natural Gas

1-OFF

Refer to 

Table 1  

on page 

103 in the 

Installation 

Operation 

Manual.

Propane Gas

1-ON

2 & 3 High 

Altitude

0-1,999 ft 

(0-609 m)

2-OFF, 

3-OFF

2,000-5,399 ft 

(610-1,645 m)

2-ON, 

3-OFF

5,400-7,699 ft 

(1,646-2,346 m)

2-OFF, 

3-ON

7,700-10,100 ft 

(2,347-3,078 m)

2-ON, 

3-ON

SW

Function

Setting

Comment

4

Well Pump

Used

4-ON -

Unused

4-OFF -

5 & 6 Country

US/Canada

5-OFF, 

6-OFF -

7

Space 

Heating 

Thermostat

Used

7-OFF -

Unused

7-ON -

8

Exhaust 

Temperature 

Control

Used

8-OFF -

Unused

8-ON -

Note

 

·

When PCB DIP switch 2 #8 is set to 

On, ensure that CPVC, 

polypropylene, or stainless steel is 

used for exhaust venting.

 

·

This unit may be installed at 

elevations up to 10,100 ft (3,078 m) 

for use with natural gas and 

propane. To use the unit at a specific 

altitude, the DIP switches should be 

set as described above. 

 

·

High Altitude: Above 2,000 ft (610 m), 

the unit will de-rate by 3% for each 

1,000 ft (305 m) of altitude gain.

 

·

For NG, if you install the unit at 

above 5,400 ft (1,646 m), it is 

required to change the Gas Orifice 

for high altitude. Be careful not to 

confuse it with the LP Gas Orifice. 

For detail, refer to page 103 in the 

Installation & Operation Manual.

 

 

Отзывы: