NavePoint Basic Series Скачать руководство пользователя страница 3

Step 1 – Attach Bottom Panel to Front and Rear Frames

Step 2 – Attach Top Panel

Lay Bottom Panel (#2) on a hard surface.  Be sure to protect it from scratching with cardboard or cloth.

Insert Front and Rear Frames (#3) with large flange oriented to the inside.Be sure that the slots in the

surface is facing inward.    

cagenut  

Attach with (Bag D) M8 Hexagon Screws  (8 pcs) and (Bag E) M8 Flange Nuts (8 pcs)

Overlay the Horizontal Beams so that the notches interlay with the large flanges on the Front and Rear Frames. 

The holes for the hex nut and screw should align properly.  Be sure to orient the Horizontal Brams so that the flat, 

Place the Top Panel (#1) on the hard surface.  Be sure to protect it from scratching with cardboard or cloth.  

Overlay the Horizontal Beams (#6) so that the notches interlay with the large flanges on the Front and Rear 

Attach with (Bag D) 

 (8 pcs) and (Bag E) 

 (8 pcs)

M8 Hexagon Screws 

M8 Flange Nuts

 
Turn the assembly over and insert it into the top panel.  Be sure that the top and bottom Panels (#1 and #2) 

are oriented in the same direction (front matches front, back matches back).

 
Frames.  The holes for the hex nut and screw should align properly.  Be sure to orient the Horizontal Beams 

so that the flat, cagenut surface is facing inward. 

center of the frames are facing inward as shown below. 

Page 3

Содержание Basic Series

Страница 1: ...6U 9U 12U 15U 18U 22U 2018 20180327 ...

Страница 2: ... Screw M6 Cage Nut M6 12 Screw A B M6 Cage Nut M6 Plastic Washer 12PCS 12PCS 12PCS 6U 12U 24PCS 15U 22U 12PCS 6U 12U 24PCS 15U 22U 12PCS 6U 12U 24PCS 15U 22U M4 8 Self tapping Screw C White Plastic Washer M8 12 Inner Hexagon Screw D M8 Flange Nut E Casters Optional F Lock Kit H Expansion Screw I Ground Wire Kit J 12PCS 1PCS 16PCS 16PCS 4PCS 15U 22U M6 12 Self tapping Screw G 16PCS For Casters 1PCS...

Страница 3: ...gn properly Be sure to orient the Horizontal Brams so that the flat Place the Top Panel 1 on the hard surface Be sure to protect it from scratching with cardboard or cloth Overlay the Horizontal Beams 6 so that the notches interlay with the large flanges on the Front and Rear Attach with Bag D 8 pcs and Bag E 8 pcs M8 Hexagon Screws M8 Flange Nuts Turn the assembly over and insert it into the top ...

Страница 4: ...d Bag A When determining the appropriate depth be sure to consider the equipment that you plan to mount inside the enclosure This may include the provided L Brackets 1 2 3 4 5 6 1 2 3 4 5 6 Note Be sure that the rail depth is the same on both sides of the cabinet Pay attention to the numerical unit markings on the rails to be sure they are right side up Page 4 ...

Страница 5: ...Step 4 Install L Type Mounting Brackets Optional Mount the provided L Type Mounting Brackets 7 to the Vertical Mouting Rails on each side of the cabinet using the cage nut kits provided Bag A Page 5 ...

Страница 6: ...Step 5 Attach the Back Panel Attach the Back Panel 8 to the assembly using the M4 Screws Bag C 6 pcs provided 4 Page 6 ...

Страница 7: ...Step 6 Side Panels Click the Side Panels 5 into place using the plastic tabs on either side Page 7 ...

Страница 8: ... the picture below To install the Tempered Glass Door 4 locate the side with two pins Insert the fixed pin into door hinge hole With your thumb pull down on the spring pin and slide it into place over second door hinge hole and release The pin should click into place securing the door Page 8 ...

Страница 9: ...Step 8 Install Cable Management Covers optional Attach the top and Bottom Cable Management Panels using the M4 Screws BagC 2 pcs each provided Cable Management Covers Page 9 ...

Страница 10: ...Step 9 Mounting Bracket M4 4 Page 10 Bag ...

Страница 11: ...tep 10 Install Casters Optional and only compatible and included with 15 18 and Attach Casters Bag F with M6 screws Bag G to bottom of the cabinet 22U versions of the Performance Series Cabinets Page 11 ...

Отзывы: