Installation Part 2
5. Drop the plastic panel over the passenger side kick panel area
by taking out (1) t20 Torx screw and pulling the panel towards
the floor. Run the black, white/blue and white/red wires from the
new radio harness into the opening as in the picture to your left.
These wires will power your reverse and front cameras, as well
as the video switcher.
6. If your vehicle is not equipped with a stock camera and you are
not installing a front camera then simply unplug the male RCA end
from the female in the aftermarket harness and run your camera’s
video RCA directly to the female plug. Connect ground for the
reverse camera to the black wire and 12 volt positive to the
white/red from step 5 and insulate the white/blue wire. Skip to step
8.
Vehicles with factory camera
VSW-R
installation
7a. Extend and plug the female RCA (radio side) of the harness into AV1
out. Extend and plug the male RCA (vehicle side) into AV1 in. Connect a
front camera, for example, a Flir night vision camera RCA into
Video 2
in.
Connect the black ground wire from step 5 to both the ground of the front
camera and the ground (black wire) from the video switcher. Connect the
12v wire
(Video 2 Trig)
of the switcher (
white/
red wire) to the white/blue
wire
from the module
.
Vehicles without factory camera switcher installation
7b. Extend and plug the female RCA (radio side) of the harness into
Video Output
. Plug the RCA from your aftermarket rear view camera into
Video 1
in
put (VSW-R)
. Connect a front camera, for example, a Flir night
vision camera RCA into
Video 2
in. Connect the black ground wire from
the switcher to the ground from the switcher, the reverse camera and the
front camera. Connect the white/red wire to the 12v wire to your
aftermarket back up camera. Connect the white/blue wire to the 12v wire
on your front vision camera
8. Plug the fiber optic cable you unplugged in step 3 into the aftermarket
harness. Reconnect all the antenna, power and all other connectors back
into the radio and slide the radio back into the dash. Reassemble in the
reverse order as steps 1,2 and 5. Now you are ready to proceed to the
programming and operations section. Good job!
3 |
P a g e