![Nautilus Extreme MXE-500 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/nautilus/extreme-mxe-500/extreme-mxe-500_operating-manual_3527991004.webp)
4
Technical Specifications
Nautilus Extreme MXE-500 High Pressure Extractor
Height: 42-1/4”
Length: 34-3/8”
Width: 23-3/8”
Weight: 146 lbs.
Solution Tank Capacity: 12 gallon
Recovery Tank Capacity: 12 gallon
Solution Pump:
Pump-Tec #207V pump with 1/2 HP Motor - 0-500 psi – 1.06 gpm
Vacuum Motors:
Two AMETEK Lamb 8.4” diameter 2-Stage – tangential discharge
Can be operated in series or parallel configuration
Pump-out Pump:
Little Giant 120VAC 8-20 gpm
(Optional)
Maximum psi 11.4 – Maximum pumping height 26 ft.
Power Draw:
Cord #1 – 21.48 amp wide open / 11.58amp full load
Cord #2 – 13.70amp wide open / 7.40amp full load
(Add 5.00amps to Cord #2 for units with optional Pump-Out Pump)
Standard Equipment
Vacuum Connection:
2” Barb or 2”Male Flash Cuff with 2” Male NPT
Vacuum Hose:
25’ X 1-1/2” with 1-1/2” cuff & 2” cuff
2” Female Flash Cuff x 1-1/2” hose adapter
Carpet Wand:
1-1/2” SS Dual Jet S-Bend Wand
– AW29
Accessory Mounting Hardware: Four 1/4-20 x 5/8” SS Screws and Washers
HP Solution Hose:
25’ x 1/4” with 1/4” male & female quick connects
Power Cords:
2 – 25’ x 12gauge with male & female plug ends
Electrical:
Dual Circuit Indicator
10amp Pump Circuit Breaker
Two Internal Component Cooling Fans
Optional Features:
Auto Fill System with chemical draw:
Metering Tip Kit:
14 different tips for changing chemical dilution rate
Water Supply Hose:
50’ x 3/8” with 1/4” female quick connect &
Female garden hose fitting
Auto Pump-out System:
Pump-out Hose:
50’ x 3/4” with male & female garden hose fittings
Содержание Extreme MXE-500
Страница 1: ...1 LMANN21 REVISED 01 29 2015 MXE 500 Operating Manual EXTREME...
Страница 38: ...38 OPTIONAL AUTO FILL FLOAT VALVE ASSEMBLY NM5740...
Страница 40: ...40 Pump Out Pump PARTS ASSEMBLY...
Страница 41: ...41 1 2 10 11 4 3 5 4 3 7 6 8 9 8 9 8 9 8 9 39 12 2...
Страница 44: ...44 32 32 43 46 37 44 46 45 52 53 TOP VIEW OF BASE 3 58 59 39 55 56 55 56 3 58 59 110 9 50 51 51 47 9 54 64...
Страница 47: ...47 9 41 2 BOTTOM VIEW SOLUTION TANK BASE SKIRT 72 1 73 9 9 8 8 39 74 75 76 77 77 79 122 30 30 118 119 31 75 121...
Страница 48: ...48 2 39 1 72 73 73 67 9 30 31 82 83 2 83 82 84 INSIDE SOLUTION TANK BOTTOM VIEW SOLUTION TANK...
Страница 49: ...49 85 86 87 101 86 102 1 VACUUM SHUTOFF ASSEMBLY INSIDE RECOVERY TANK WITHOUT OPTIONAL PUMP OUT 85 87 111...
Страница 51: ...51 92 91 95 94 112 13 14 14A 104 105 1 39 OPTIONAL PUMP OUT CONNECTIONS...
Страница 52: ...52 35 36 79 78 36 79 34 39 123 124 125 2 1 128 32 34 126 39 127...