15
Nautilus® Pro Series Elliptical Assembly Manual
ASSEMBLY PROCESS
Step 8: Attach Connecting Arm Pivots
8-1 Use (1) M12 x 90mm Allen Head Bolt (Ref #25) and (1) M12 Locking Nut (Ref #21) to attach the Front
Connecting Arm Pivot (#24) and torque to 36 ft/lbs.
8-2 Use (1) M12 x 100mm Allen Head Bolt (Ref #19) and (1) M12 Locking Nut (REf #21) to attach the Rear
Connecting Arm Pivot (#26) and torque to 36 ft/lbs.
8-3 Repeat Step 6 and 7 for the Right Side Pod Assembly, Foot Plates and Connecting Arm Pivots.
7 ! 2 . ) . '
! 4 4 % . 4 ) / .
$ ! . ' % 2
)--%$)!4%!#4)/.2%15)2%$
# ! 5 4 ) / .
BoLT #
19 AND #25
MuST Be TIgHTeNeD To
36
fT/LBS (
500
kg/CM) BefoRe PRoCeeDINg To THe NexT STeP.