XR6/XR3 Installation Manual
Installing the power transformer
Issue 3.1 2014-06-04
Page 3-1
Section 3:
Installing the power
transformer
1. Before placing the transformer into the transmitter, set the line voltage tap selections. Based
on your nominal line to line (or line to neutral for some single-phase ac power sources)
voltage, select the appropriate tap position identified on the labels mounted on the terminal
board end of the transformer. One label identifies the tap number and the line-to-line (or
line-to-neutral) voltage. Another label identifies the tap. All phases must be set to the same
tap (see also
Figure 3.1
). If necessary, use the hardware already on
each of the three copper straps to connect the straps to the new tap positions. Be sure to
scrape any excess epoxy off the electrical joint area.
Transformer taps
Figure 3.1: Three-phase XR6 power transformer line voltage tap layout
1
2
3
4
5
6
LOAD 3
LINE 3
LOAD 2
LINE 2
LOAD 1
LINE 1
244 V Load Terminals
150 V Load Terminals
90 V Load Terminals
(T1-LD High wires)
(T1-LD Med wires)
(T1-LD Low wires)
Содержание XR3
Страница 1: ...XR6 XR3 Transmitter Installation Manual Document XR6 XR3 INST Issue 3 1 2014 06 04 Status Standard...
Страница 2: ......
Страница 4: ......
Страница 8: ...XR6 XR3 Installation Manual Page viii Issue 3 1 2014 06 04...
Страница 18: ...XR6 XR3 Installation Manual Page xviii Version 3 1 2014 06 04...
Страница 24: ...XR6 XR3 Installation Manual Unpacking and positioning Page 2 4 Issue 3 1 2014 06 04...
Страница 40: ...XR6 XR3 Installation Manual Installing the RF connector Page 6 6 Issue 3 1 2014 06 04...
Страница 52: ...XR6 XR3 Installation Manual Adjusting the spark gap Page 7 12 Issue 3 1 2014 06 04...
Страница 72: ...XR6 XR3 Installation Manual Control and monitoring Page 9 14 Issue 3 1 2014 06 04...
Страница 84: ...XR6 XR3 Installation Manual Parts and tools Page 12 4 Issue 3 1 2014 06 04...
Страница 99: ......