![Nautel NX3 Скачать руководство пользователя страница 44](http://html1.mh-extra.com/html/nautel/nx3/nx3_installation-manual_711214044.webp)
NX5/NX3 INSTALLATION MANUAL
COMMISSIONING TASKS
PAGE 2.8.2
VERSION 3.1 2021-04-22
Commissioning
NOTE
: The following procedures require the use of the transmitter’s front panel UI and pushbuttons
). If you require assistance to navigate the front panel, refer to the NX5/NX3 Operations
& Maintenance Manual for detailed information.
Figure 2.8.1: Front Panel User Interface
Turning on the Transmitter
1.
Switch on the ac power at the service entrance to turn on the transmitter.
NOTE
: You may notice a flashing amber light on the control/interface PWB behind the front door.
This is the
CPU OK
LED and it is indicating that the microcontroller is operating normally.
2.
Check the alarm and status indications on the front panel UI’s
Main Menu
->
View Status
->
View Alarms
menu. See the NX5/NX3 Operations & Maintenance Manual or the NX5/NX3
Troubleshooting Manual for detailed information.
3.
Check the output of the +15 V power supply on the front panel UI’s
Main Menu
->
View Status
->
View Meters
->
Rack
menu.
Forward Power
Preset 1
RF On
RF Off
Local
Remote
Status LEDs
Switches
Содержание NX3
Страница 2: ......
Страница 4: ......
Страница 8: ...NX5 NX3 INSTALLATION MANUAL PAGE 2 VIII VERSION 3 1 2021 04 22...
Страница 32: ...NX5 NX3 INSTALLATION MANUAL ADJUSTING THE SPARK GAP PAGE 2 5 4 VERSION 3 1 2021 04 22...
Страница 42: ...NX5 NX3 INSTALLATION MANUAL INSTALLING CONTROL MONITOR WIRING PAGE 2 7 6 VERSION 3 1 2021 04 22...
Страница 54: ...NX5 NX3 INSTALLATION MANUAL COMMISSIONING TASKS PAGE 2 8 12 VERSION 3 1 2021 04 22...
Страница 58: ...NX5 NX3 INSTALLATION MANUAL PARTS AND TOOLS PAGE 2 9 4 VERSION 3 1 2021 04 22...
Страница 69: ......