Page 3 of 9
Operating Instructions:
1. Connect the 10-10/10-20 Pin Box (#2 in the image below) to the Quantum Main Breakout (#1 in the
image below) by seating and locking (#3 in the image below) the larger pin box module into place.
2. Once the larger pin box module has been connected, seat (#4 in the image below) and lock (#5 in the
image below) the smaller input module into position.
3. Create or select a Quantum montage that uses the 10-10 or 10-20 labels. Please refer to the
NeuroWorks or SleepWorks user manuals for additional information on how to create or select the
montage.
4. Ensure the 10-10/10-20 Pin Box is enabled in the NeuroWorks/SleepWorks software by selecting
Edit | Settings | Acquisition
(tab).
Note:
Additional Breakout Boxes can be added for additional channels. Refer to the section
“Connecting the
Breakout Boxes to the Natus Base Unit
” of the Quantum User and Service Manual for additional
information.