16
ICS Aircal
ICS Aircal Delivery Head and Foot Switch
3.8.1
Refill procedure
Turn off the ICS Aircal device and disconnect it from the electrical wall outlet.
Wipe off any dust on the top of the ICS Aircal device prior to opening the case to refill the reservoir.
Face the ICS Aircal front panel. On the back right side is a small cover. Using the Allen key (supplied with the irrigator
cradle), unscrew the external cover and remove.
Using the Allen key, unscrew the internal cover and remove.
Expand the funnel supplied with the ICS Aircal device and place the funnel in the refill hole of the reservoir.
Pour water into the funnel to fill the reservoir.
Monitor the water level closely. Fill to the bottom of the lip.
Replace the internal cover and tighten the screws.
Replace the external cover and tighten the screws.
Plug the power cable of the ICS Aircal device into the electrical wall outlet and turn it on.
4
ICS Aircal Delivery Head and Foot Switch
4.1
Delivery Head
The delivery head can be held in any way that is comfortable for the tester. Flow time activation is accomplished by an
activation trigger located on the delivery head. The otoscope light can be turned on and off using the button located
on the back of the handle below the lens.
Note
•
Do NOT use this refill procedure if:
1. If the ICS Aircal device was just received from shipping and is dry. It must be filled and primed.
2. If the water level in the display has gone to zero because the user never refilled it when the orange bar was
present.
3. If the ICS Aircal device was tilted at more than 20° with the water pump running.
If one of these criteria were met, refer to
Note
•
Only
use distilled water. Using common water from the tap will result in mineral deposits and will harm
the ICS Aircal device.
Warning
•
Do NOT overfill the reservoir. If water was spilled into the small indentions where the internal
cover is placed, wipe up this excess water before replacing the internal cover.
Note
•
Due to the possibility of freezing during shipment, water must be drained from the reservoir before shipping
the ICS Aircal. See