background image

11

IMNL-010-2024-01-08

ecoflo.com.au 

PH 1300-138-182

USING THE NL3

STARTING WITH AN EMPTY CHAMBER

1.  Once the pedestal has been installed, place one compost chamber inside the pedestal.
2.  Remove the chamber lid and put back the pedestal lid. Do not misplace the chamber lid and 

make sure it is kept somewhere safe.

3.  Connect the power outlet for the ventilation fan to power source.
4.  Add 2.5 litres of bulking agent into the composting chamber.
5.  NL3 is ready to be used!

OPERATION

It is important to place bulking material into your toilet, we suggest 1 cup per day directly into the 
compost chamber. This amount is based on two people using the system full time. 

In times of heavy use, if the liquid is not draining well through the compost or if the compost appears 
too dry, we suggest mixing the additional bulking agent through the compost pile. By mixing the solid 
waste, paper and bulking material, the compost will be kept porous and moist and the supply of 
oxygen will increase, which substantially speeds up the transformation of waste materials into humus.

Bulking material: Hemp, wood shavings or other carbon rich fibrous material. (Sawdust is not 
recommended)

ROTATING THE CHAMBER

The active compost chamber should be replaced with an empty one when it is approximately 75% full 
or when the pile is approximately 200 mm from top of the toilet seat.
6.  Remove the pedestal lid and place the chamber lid on. 
7.  Swing the handle upright and lift the chamber out from the pedestal. When lifting the chamber, 

please be cautious incase of droplets from the chamber floor holes.

8.  Place the chamber outside for secondary composting. The chamber should be placed in a warm 

sunny position (where direct access is restricted). 

9.  Put the empty second chamber into the pedestal. Remove the chamber lid and keep it in a safe 

place.

10.  Add bulking agent and microbes.
11.  Replace the pedestal lid.
12.  NL3 is ready to be used again.

WARNING

Never put cigarettes or other burning material, or any sanitary products into your toilet.

Содержание NL3

Страница 1: ...NL3 OWNER S MANUAL AUS NZ ecoflo com au IMNL 010 2024 01 08...

Страница 2: ...ITEMS NOT INCLUDED 3 TOOLS REQUIRED 4 NL3 INSTALLATION OPTIONS 4 NL3 INSTALLATION INSTRUCTIONS 5 POWERING THE FAN 9 EXCESS LIQUID DRAIN 10 USING THE NL3 11 HOW COMPOSTING WORKS 12 COMPOST ACCELERATOR...

Страница 3: ...LIED FAN IN HOUSING L I T REDUCER PIPE BRACKET NOT SUPPLIED DWV PIPE NOT SUPPLIED OUTLET PIPE TO ABSORPTION TRENCH SPECIFICATIONS Capacity 2 person full time use Max Load Bearing 130kg Material LDPE D...

Страница 4: ...MOUNTING BLOCKS TOILET ROLL 50MM WALLACE SEAL CHAMBERS VENT COWL 12V TRANSFORMER 90 50MM DWV BEND REDUCER HOSE TAIL HOW TO USE SIGN WHAT S IN THE BOX ENZYMES MICROBES 25mm SULLAGE HOSE PEDESTAL WITH...

Страница 5: ...ircumstances of your installation you may require the following items TRENCH ARCH DRAIN FOR THE EXCESS FLUID DRAIN AGI DRAIN WITH SOCK GRAVEL A Drain Kit can be purchased from ecoflo com au FOR THE VE...

Страница 6: ...e vent pipe exiting directly through the rear wall See OPTION 1 Alternatively the vent pipe can be installed on the inside exiting up through the ceiling See OPTION 2 This must be indicated at the tim...

Страница 7: ...24 01 08 ecoflo com au PH 1300 138 182 Mark holes on rear wall with pencil Ensure the hole is sloping downwards to the outside SIDE VIEW BACK VIEW NL3 INSTALLATION INSTRUCTIONS 1 2 Drill 38mm hole Dri...

Страница 8: ...com au PH 1300 138 182 DWV Pipe Sullage Hose Hose tail Insert rubber wallace seal use soapy water if difficult to insert Feed vent pipe sullage hose through the wall Ensure the hose end point is lower...

Страница 9: ...7 IMNL 010 2024 01 08 ecoflo com au PH 1300 138 182 Cut PVC if required Connect the 90 DWV Bend and the Reducer to the DWV Pipe OUTDOOR VIEW Secure pedestal to wall with mounting blocks 5 6...

Страница 10: ...8 IMNL 010 2024 01 08 ecoflo com au PH 1300 138 182 Connect the Fan Housing to the Reducer Min 600mm 7 8 9 Installation complete...

Страница 11: ...d run 24 hours a day to continuously circulate air through the compost heap Connect the fans to the transformer as follows 1 3 5 2 4 6 Unscrew the fan housing cover Attach the transformer cables to th...

Страница 12: ...d permeability and in a position where ground water will not flood the unit 3 If there is some doubt as to the permeability of soil extra trenching length may be required especially if a hand basin or...

Страница 13: ...compost will be kept porous and moist and the supply of oxygen will increase which substantially speeds up the transformation of waste materials into humus Bulking material Hemp wood shavings or othe...

Страница 14: ...hing includes gloves appropriate footwear a face mask and eye protection You should dispose of the composted waste in accordance with any and all local authority regulations For an on site burial of c...

Страница 15: ...weekly basis The bulking agent can be added through the pedestal For best results use pine wood shavings or hemp bedding available to purchase from Ecoflo or find at your local hardware or pet store W...

Страница 16: ...Check if the drainage outlet is being blocked If drainage outlet is okay this could be caused by prohibited solids blocking the perforated holes in the floor of the compost chamber Insufficient air f...

Страница 17: ...ing Always place a layer of bulking agent over the top of the pile in the out of service chamber to eliminate the possibility of insects laying eggs WARRANTY Pedestal 10 years warranty Any damage caus...

Страница 18: ......

Отзывы: