NOTES: Please check for any damage caused by the shipping company and take appropriate steps
to file a claim, if needed.
*Please call
Digsafe
and check for any underground utilities before digging anywhere.
Materials needed
Cordless drill/driver, T25 bit, T30 bit, auger and/or post hole shovel, spade shovel, transfer (flat) shovel, grade
rake, garden rake, level, tape measure, hand tamp, 6’ ladder, and seventy (70) 50lb bags of fast-setting
premixed concrete (not included). Concrete amount required may very depending on how deep you can get
the holes. Concrete amounts can be easily calculated at
http://www.quikrete.com/Calculator/Main.asp
Instructions
1. Remove items from pallet or packaging. You should find one (1) 11’-10” deck frame assembly, eight (8)
deck frame posts, six (6) deck railing assemblies, one (1) stair assembly, two (2) stair posts, two (2) stair
railings, one (1) slide mounting board, one (1) deck/slide railing assembly, some loose stair and deck
boards, and provided hardware.
2. First, we’ll attach the deck frame to the eight deck frame posts. Mark a line 23-1/2” up from the bottom of
each of the eight deck frame posts (deck frame posts are 5’-4” long).
*Note:
It is recommended to attach deck frame to the deck frame posts on flat ground (such as a
parking lot), then be carried to desired installation location. All pieces are labeled for easy
assembly.
3. With the deck frame assembly laying on flat ground, insert each post into their corresponding notch out in
the deck boards. Now slide the deck frame assembly up the posts until the bottom of the 2x6 deck frame is
flush with the line we drew in step 2, and fasten the deck frame to the posts through the marked locations.