Arbor Swing
Installation Instructions
Page of
4
Image 1: Post Assembly
Image 2
Страница 1: ...1 4 Post Joist 2 Top Joists 5 Trim Pieces 4 Main Joists 3 Railing Sections 2 Note Each post consists of two shiplap L notched post halves not shown to be assembled on site Arbor Swing not shown Cross...
Страница 2: ...to the posts Insert the railing section into the two notches located toward the center of the post on both of the corresponding posts The end of the railing should be flush with the end of the post a...
Страница 3: ...assembly upright by hand or with strapping fill 1 4 of the hole with fast setting concrete mix and add water per instructions on bag Recheck to make sure arbor swing assembly is level and plum and ma...
Страница 4: ...Arbor Swing Installation Instructions Page of 4 4 Image 1 Post Assembly Image 2...