background image

Proper product installation, in accordance with these instructions, is the responsibility of the installing agent.  

If you have any questions concerning these instructions, please call National Customer Service 

800.482.1717

.

 

Assembly Instrucon 

Recommend Tools 

  

Drill

 

Telephone 800.482.1717 
Fax 812.482.8800 

www.NationalOfficeFurniture.com

 

 
Part #

 

2513735 

Rev, - 
 
Printed in U.S.A 
© 2013 Kimball International, Inc.

 

Epicenter Full Height 
Inserts—Veneer/
Laminate

 

After all ganging is complete and Epicenters have been installed, 
align the mounting brackets on the back of the Full Height insert with 
the upper Epicenter U-channel and lower Epicenter U-channel 
(Figures A & B). 

Figure A 

Figure B 

Package Contents            Qty. 

  

Insert                                1

 

  

Brackets 

 

  1

 

  

1

/

16

” Diam. Washer    Per Order

 

  #6 x ¾” Screws                4 

 

  #8 x ½” Screws          Per Order 

 

 

Содержание 2513735

Страница 1: ...x 812 482 8800 www NationalOfficeFurniture com Part 2513735 Rev Printed in U S A 2013 Kimball International Inc Epicenter Full Height Inserts Veneer Laminate 1 After all ganging is complete and Epicenters have been installed align the mounting brackets on the back of the Full Height insert with the upper Epicenter U channel and lower Epicenter U channel Figures A B Figure A Figure B Package Conten...

Страница 2: ...OfficeFurniture com Part 2513735 Rev Printed in U S A 2013 Kimball International Inc Epicenter Full Height Inserts 2 Push Inserts toward center of run in all ganging applications If gap is present on end of runs install blinders onto end of end of run inserts Figure C Reference AI2508094 to install blinders Figure C 3 If Panels are out of plane with each other Figure D use additional brackets to b...

Страница 3: ...hone 800 482 1717 Fax 812 482 8800 www NationalOfficeFurniture com Part 2513735 Rev Printed in U S A 2013 Kimball International Inc Epicenter Full Height Inserts Laminate and veneer inserts will require drilling 4 6 x Panhead philips screws to attach the brackets between inserts Figure E Back View 4a If inserts show any bowing use drill with 8 x screws and 2 to 1 1 16 outside diameter washers to p...

Страница 4: ...d in U S A 2013 Kimball International Inc Epicenter Full Height Inserts 4b Drill screws with 1 to 2 washers through Epicenter frame slot as necessary Drill will go through U channel slot to secure fastener to insert Use as many as necessary to pull out bow in wood laminate inserts Figure G1 and G2 Bow may also be pulled out using screws through the back of the lower epicenter L see Figure G3 Figur...

Отзывы: