TB-9212 Calibration Procedure
Verification
The following performance verification procedure describes the sequence of operation and
provides test points required to verify the TB-9212. The verification procedure assumes that
adequate traceable uncertainties are available for the calibration references.
Terminal Block CJC Verification
Complete the following procedure to determine the As-Found status of the TB-9212.
1.
If you are using a TB-9212 with screw terminal, loosen the captive screws and remove the
top cover. If you are using a TB-9212 with mini-TC, you do not need to remove the top
cover.
2.
Connect the thermocouple calibrator to the TB-9212 using the barrier strip assembly
created in the
Building the Barrier Strip Assembly
section. Refer to Figure 2 for a
connection diagram.
Figure 2.
TB-9212 Verification Connections
3.
If you are using a TB-9212 with screw terminal, reinstall the top cover.
4.
Connect the TB-9212 to the NI 9212.
5.
Power on the thermocouple calibrator and set the thermocouple type to E-type.
6.
Wait 15 minutes or the warm-up time required by the thermocouple calibrator, whichever
is longer.
.
.
.
NI TB-9212
B
a
rrier
S
trip
E0+
E0–
E1+
E6–
E7+
E7–
E1–
E6+
.
.
.
.
.
.
TC0+
TC0–
+
–
+
–
TC1+
TC6–
TC7+
TC7–
TC1–
TC6+
.
.
.
Mini TC
Connector
TC
C
a
li
b
r
a
tor
B
a
rrier
S
trip A
ss
em
b
ly