background image

4

|

ni.com

|

RM-4339 Calibration Procedure

Connecting the Calibrator to the RM-4339

Caution

Always have the NI PXI Express chassis powered off when inserting a 

module into the chassis.

Refer to the specific verification procedure section for information describing the required 
connections.

Note

To minimize the number of verification connection changes, the connections 

for SCA shunt calibration resistance verification and quarter-bridge shunt calibration 
verification can be made simultaneously.

The RM-4339 provides support for up to three NI PXIe-4339 modules. The 96-pin DIN 
connectors used to connect the NI PXIe-4339 to the RM-4339 through the SH96-96-2 cable are 
located on the rear of the RM-4339 and are labeled A, B, and C. To fully verify the RM-4339, 
each of the verification procedures in this document must be conducted for each position A, B, 
and C. Refer to the 

NI PXIe-4339 and RM-4339 User Guide and Terminal Block Specifications

 

for information about how to install and use the RM-4339.

Test Conditions

The following setup and environmental conditions are required to ensure the RM-4339 meets 
published specifications.

Keep connections to the RM-4339 as short as possible. Long cables and wires act as 
antennas, picking up extra noise that can affect measurements.

Verify that all connections are secure.

Shielded and twisted pair copper wire is recommended for all cable connections to help 
prevent external noise sources from coupling into the measurements.

Maintain an ambient temperature of 23 °C ± 5 °C. The offset voltage verification procedure 
requires less than 1 °C of ambient temperature variation over the duration of the test. Refer 
to 

Offset Voltage Verification

 procedure for more details.

Keep relative humidity below 80%.

Allow a warm-up time for each of the instruments used in this procedure according to the 
specific instruments operating instructions.

Ensure that the PXI Express chassis fan speed is set to HIGH, that the fan filters are clean, 
and that the empty slots contain filler panels. For more information, refer to the 

Maintain 

Forced-Air Cooling Note to Users

 document available at 

ni.com/manuals

.

Содержание RM-4339

Страница 1: ...curacy Verification 9 Specifications 12 World Wide Support and Services 13 Software Calibrating the NI RM 4339 requires the installation of NI DAQmx on the calibration system Driver support for the RM...

Страница 2: ...dware setup NIPXIe 4339 User Manual NI PXIe 4339 specific information NI PXIe 4339 Specifications NI PXIe 4339 specifications and calibration interval NI DAQmx Readme Operating system and application...

Страница 3: ...r and can sink 15 mA on the 120 setting 8 mA on the 350 setting and 3 mA on the 1 k setting Ohm Meter NI PXI 4070 If this instrument is unavailable use a 6 digit DMM with 2 wire resistance measurement...

Страница 4: ...how to install and use the RM 4339 Test Conditions The following setup and environmental conditions are required to ensure the RM 4339 meets published specifications Keep connections to the RM 4339 a...

Страница 5: ...erification procedures assume that adequate traceable uncertainties are available for the calibration references SCA Shunt Calibration Resistance Accuracy Verification This section provides instructio...

Страница 6: ...hunt Cal c Commit the task by calling DAQmx Control Task with the following parameter Action Commit 4 Take a resistance measurement from the DMM and record the result 5 Compare the result from step 4...

Страница 7: ...n of the environment should be kept within 1 C between measurement of the offset error of the NI PXIe 4339 and the offset measurement of the RM 4339 Complete the following steps to verify the offset v...

Страница 8: ...nector on the back of the RM 4339 4 Connect an RJ50 cable to each channel with AI pin 2 and AI pin 3 connected to T pin 9 5 Acquire voltage measurements from all channels with the NI PXIe 4339 a Creat...

Страница 9: ...connect QTR pin 5 to LO and connect AI pin 2 to LO as shown in Figure 2 Figure 2 RJ50 to Calibrator Connections b QTR and AI must be connected together at the calibrator The EX lead wire and the QTR l...

Страница 10: ...erage the readings that you acquired and record the values as ResultSCD g Clear the task by calling DAQmx Clear Task 7 Acquire an AI Bridge V V measurement with shunt calibration enabled a Create a ta...

Страница 11: ...47 for 350 SCalExp 0 00248756 for 1 k For reference the calculation for the expected shunt calibration deflection is given by the following equation where Req is the equivalent parallel resistance of...

Страница 12: ...e Test limits in this document are based upon the March 2015 edition of the NI PXIe 4339 and RM 4339 User Guide and Terminal Block Specifications Refer to the most recent NI PXIe 4339 and RM 4339 User...

Страница 13: ...ivate expense and is subject to the applicable limited rights and restricted data rights as set forth in FAR 52 227 14 DFAR 252 227 7014 and DFAR 252 227 7015 World Wide Support and Services The Natio...

Отзывы: