Chapter 2
Configuration and Startup Procedures
©
National Instruments Corporation
2-15
Slot 0 Resource Manager Operation
At startup, a GPIB-VXI/C configured as a Slot 0 Resource Manager
performs its self-tests, executes the RM functions, and then enters its
normal mode of operation.
Front Panel LED Indications for RM Operation
The five front panel LEDs are
SYSFAIL
,
FAILED
,
TEST
,
ON LINE
, and
ACCESS
. The GPIB-VXI/C uses the
FAILED
,
TEST
, and
ON LINE
LEDs
to indicate the progress of its self-initialization, self-test, and RM functions.
The LED indications are shown in Table 2-9. A successful system startup
will sequence through the first five states. The point of failure is indicated
for states in which the
FAILED
LED is lit for an extended period of time.
The LED indications are identical for Slot 0 Resource Manager and
Non-Slot 0 Resource Manager operation.
Table 2-8.
CLK10 Routing Options
Switch S15
Switch S59
Function
OFF
OFF
CLK10 sourced from onboard
clock.
ON
OFF
CLK10 and EXT CLK connector
sourced from onboard clock.
OFF
ON
CLK10 sourced from an external
clock via the EXT CLK connector.
ON
ON
Invalid. Do not use this setting.
Table 2-9.
Front Panel LED Indications for RM Operation
Sequence
FAILED
TEST
ON LINE
State
Point of Failure
1
OFF
OFF
OFF
No power
Failed before self-test
2
ON
OFF
OFF
In self-initialization
Failed in self-test
3
ON
ON
OFF
In self-test
—